Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹9.4 LAccepted-AOC | Ist | Accepted-AOC L1 | |
| 2 | IInd₹9.4 LRejected-AOC | IInd | Rejected-AOC L2 | |
| 3 | IIIrd₹10.0 LRejected-AOC 16F 1K NEW MARKET BAMRAULI NEAR BAMRAULI RAILWAY STATION ALLAHABAD UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | IIIrd | Rejected-AOC L3 | |
| 4 | IVrt₹10.0 LRejected-AOC | IVrt | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
22 Jul 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
23-ETC-I(A)/ 2021-2022
2021_UPTCL_602176_1
23-ETC-I(A)/ 2021-2022
Open Tender
Electrical Works
Item Rate
60 days
Panki
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE,ETC,PRAYAGRAJ
₹10,000
22 Sept 2021
9 Jul 2021
23 Jul 2021
9 Jul 2021
22 Jul 2021
9 Jul 2021
120 days
Amount
Revetment of foundation of tower location No. 653(A type) of 400 KV Rewaroad (GIS)-Panki Line under Electy. Trans. Division-I, Prayagraj. The job includes the following works :-
Cost of Excavation of earth including all earth work, backfilling and levelling.
Cost of concrete with 40 mm alone ballast, coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc. required for proper completion of work satisfactorily.
Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete.
1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to obtained by the contractor from out side including watering, ramming and dressing of earth etc. complete including the cost of earth, royalty, taxes etc. and cost of material, labour and T&P required for proper completion of work satisfactorily.
12 mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material, labour and T&P etc. required for proper completion of work satisfactorily.
1st class brick on the edge floor laid including preperation of base to proper slope including supply of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Making weep holes providing plastic pipe of length 30 mtr. (cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0 mtr. at depth of 0.5 mtr., 1.25 mtr. and 2.0 mtr. respectively from the top of the revettement wall ).
Marc vision
R.S.ASSOCIATE
M/S Narayan Electrical & Engineering Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .