Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.1 L
EMD Value
₹4,140
Closing Date
24 Jul 2023, 3:00 pmClosed
block development officer vp
block development officer vp vedaranyam
Providingkatharipulam koilkuthagai government hr school cycle shed
2023_RDTN_336340_11
1570/2023/b3
Open Tender
Civil Works
Works
90 days
vedaranyam
Please refer Tender documents.
4 documents required · 4 mandatory
₹100
block development officer vp
₹4,140
Yes
25 Jul 2023
7 Jul 2023
24 Jul 2023
7 Jul 2023
24 Jul 2023
7 Jul 2023
Amount
Construction of Bicycle Shelter at Government Higher Secondary School in kovilkuthagai at Katharipulam Panchayat.
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. Including leveling the sites complete complying with standard specifications and as directed. In sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. TNBP SS NO 20B 23 & 24
Collection and supply of M.sand and filling in to the basement including cost andconveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix (one cement four sand and Eight hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted .
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
Cement concrete 1:2:4 mix (one cement four sand and Eight hard broken stone) using 40mm ISSHBG metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. Completeas per specification and as direceted
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding laid over country wood (silver Oak) joists of size 10 cm x 6.5 cm spaced at 90cm centres and supported by casurina props of size 10 - 13cm dia spaced at 75 cm centres including necessary cross bracings\ etc., complete complying with standard specifications 10 m2 Shuttering.
Supply of Truss Materials
Truss Rectangular Tubular Section of size 3" X 1 1/2"
Purlin Rectangular Tubular Section of size 1 1/2" X 1 1/2"
Supplying and fixing colour coated galvanised sheet for roofing including all labour charges for fixing necessary bolts, nuts, screws etc., complete
Labour Charge for Pipes & Trusses
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 18% for other than Earth Quantity
C.D.Veeramani
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .