| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 CrAccepted-AOC VILLAGE POST PUNCHA DIST PURULIA PIN 723151 WEST BENGAL | PUNCHA | PURULIA | WEST BENGAL | 723151 | ₹14.1 Cr | L1 | Accepted-AOC L1 bidder, Bid Rank L1 |
| 2 | L2₹14.2 Cr+₹11.7 L (0.83%)Rejected-Finance 24 2 K N ROAD P O BERHAMPORE DIST MURSHIDABAD PIN 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | ₹14.2 Cr+₹11.7 L (0.83%) | L2 | Rejected-Finance 2nd Lowest Bidder, Bid Rank L2 |
| 3 | L3₹15.0 Cr+₹88.0 L (6.25%)Rejected-Finance | ₹15.0 Cr+₹88.0 L (6.25%) | L3 | Rejected-Finance 3rd Lowest Bidder, Bid Rank L3 |
| 4 | L4₹16.3 Cr+₹2.3 Cr (16.0%)Rejected-Finance | ₹16.3 Cr+₹2.3 Cr (16.0%) | L4 | Rejected-Finance 4th Lowest Bidder, Bid Rank L4 |
| 5 | L5₹16.4 Cr+₹2.3 Cr (16.2%)Rejected-Finance | ₹16.4 Cr+₹2.3 Cr (16.2%) | L5 | Rejected-Finance 5th Lowest Bidder, Bid Rank L5 |
Tender Value
₹15.6 Cr
EMD Value
₹10 L
Closing Date
29 Jan 2024, 2:00 pmClosed
SE, WHC-II, PWRD
OFFICE OF THE SUPERINTENDING ENGINEER, WESTERN HIGHWAY CIRCLE NO-II, P.W.(ROADS) DIRECTORATE, PURTA BHAVAN, SARAT SARANI, KODALI, HOOGHLY-712123
Panchmura to Arrah Road From 0.00 kmp to 9.90 km, Strengthening work under Bankura Highway Division in the district of Bankura under RIDF-XXIX
2023_WBPWD_633474_1
WBPWRD/SE/WHC-II/NIT_33/23-24
Open Tender
CIVIL WORKS
Percentage
300 days
Bankura
Please refer Tender documents.
4 documents required · 4 mandatory
₹10 L
Yes
Office of SE, WHC No. II, PWRD
24 Jun 2024
5 Jan 2024
31 Jan 2024
5 Jan 2024
29 Jan 2024
12 Jan 2024
10 Jan 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part-A (ROAD WORKS ) | |||||
| 1.01 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
By mechanical means (without milling machine) :
Upto 50 mm thick | 22,275 | Sqm | 3.8 | ₹84,645 |
| 1.02 | Labour for picking up existing metalled road surface to a specified average depth, including screening and stacking the pavement materials.
(c) For average depth above 75 mm but not exceeding 150 mm by manual means:
(i) Stone-metal surface. | 22,212.7 | Sqm | 25.5 | ₹5,66,423.85 |
| 1.03 | A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
GSB Grade-V
Using Pakur Variaty of stone aggregates of required sizes and medium sand(Yellow).
(Payment will be made on the basis of finished compacted volume). | 3,831.46 | Cum | 2,435.61 | ₹93,31,942.29 |
| 1.04 | A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
GSB Grade-II (Separation Layer)
Using Pakur Variaty of stone aggregates of required sizes and medium sand(Yellow).
(Payment will be made on the basis of finished compacted volume). | 1,147.5 | Cum | 1,821.71 | ₹20,90,412.23 |
| 1.05 | A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
GSB Grade-III (Drainage Layer)
Using Pakur Variaty of stone aggregates of required sizes and medium sand(Yellow).
(Payment will be made on the basis of finished compacted volume). | 1,721.25 | Cum | 2,365.65 | ₹40,71,875.06 |
| 1.06 | Wet Mix Macadam Base Course
Providing, laying, spreading ond compacting graded stone aggregate to Wet Mix Macadam specification including screening of oggregoles and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tripper to site. laying in uniform layers with Paver in Sub- base / Bose course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting' guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clouse 406 of Specifications for Rood & Bridge Works of MoRT&H (5th Revision)
Using Pakur Variety of stone aggregates of required sizes.
(Payment will be made on the basis of finished compacted volume). | 9,440.4 | Cum | 2,756.25 | ₹2,60,20,102.5 |
| 1.07 | Providing and applying primer coat with Cationic Bitumen Emulsion (Bulk, SS-1) @ 0.85kg/m2 of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For WBM/WMM Surface.
(Payment will be made on the basis of finished surface area) | 26,286.58 | Sqm | 28.78 | ₹7,56,527.77 |
| 1.08 | Providing and applying Tack coat with Cationic Bitumen Emulsion (Bulk, RS-1) of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
On Bituminous Surfaces.
By using Cationic Bitumen Emulsion (Bulk, RS-1) @ 0.25 kg/m2
Payment will be made on the basis of finished surface area. | 26,392.5 | Sqm | 8.2 | ₹2,16,418.5 |
| 1.09 | Providing and applying Tack coat with Cationic Bitumen Emulsion (Bulk, RS-1) of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
On Granular surfaces (WMM) treated with Primer
By using Cationic Bitumen Emulsion (Bulk, RS-1) @ 0.275 kg/m2
Payment will be made on the basis of finished surface area. | 26,392.5 | Sqm | 8.89 | ₹2,34,629.33 |
tech_bid_open
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1357536.xls
BOQ Document • 0.34 MB
136721755.pdf
Tender Document • 0.94 MB
Form2911.pdf
Tender Document • 0.50 MB
GO.pdf
Tender Document • 6.17 MB
136721757.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .