| 1 | L1₹67.1 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹69.5 L+₹2.2 L (3.20%)Rejected-Finance 99 MODEL TOWN PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹69.5 L+₹2.2 L (3.23%)Rejected-Finance 29 MODEL TOWN BEHIND GURUDWARA PATHANKOT | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹69.6 L+₹2.3 L (3.37%)Rejected-Finance 25 25 SADAR BAZAR JALANDHAR CANTT | JALANDHAR | JALANDHAR | PUNJAB | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹72.1 L+₹4.8 L (7.11%)Rejected-Finance 0 MEDICAL ELEBORATE CONCEPTS PRIVATE LIMITED STREET NO 3 RAJA GARDEN KAPURTHALA ROAD JALANDHAR PUNJAB 144008 | JALANDHAR | PUNJAB | 144008 | L5 | Rejected-Finance Other than lowest bidder |
Tender Value
₹87.5 L
EMD Value
₹1.6 L
Closing Date
23 Aug 2021, 6:00 pmClosed
CWE Jalandhar Cantt
HQ CWE Nalwa Road Jalandhar Cantt Pin-144005
Please refer tender documents
2021_MES_467128_1
8321/43/E8
Open Tender
Civil Works
Item Rate
90 days
Jalandhar Cantt
Class C Category a(i) or a (ii) for contractors enlisted with MES
8 documents required · 8 mandatory
₹1,000
Garrison Engineer East Jalandhar Cantt
₹1.6 L
Yes
3 Sept 2021
11 Aug 2021
25 Aug 2021
11 Aug 2021
23 Aug 2021
18 Aug 2021
Amount
Supply, installation, testing and commissioning of Medical Vacuum Plant Reciprocating Vacuum Pump with 10 HP Motor, Duplex system (1 working+1 standby) ,with reciever tank 1500 Ltr, bacteria filters, vacuum filters, Inter connecting piping all fittings made of Copper pipe complete all as per the following:- (a) Vaccum pump single stage, minimum capacity 10 HP each motor, 3 cylinder, 900 RPM, 149.6 CFM, 4236 LPM. Each pump shoud be suited for maximum working pressure of 29 inches mercurry Each pump should be fitted with MS channel frame complete having vibration isolators with 3 Nos silencers at vacuum pump discharge end. The pump should be air cooled, 3 sets of isolation valve, one non return valve and filter should be provided with pumps. The system should be expandable to receive one additional pump in future. Make : Multitech/INDO-AIR/DINT-TECH/Anestiwata/Ingersollrand. (b) Drive assembly : The electrical drive for vacuum pump should consist of suitable TEFC induction motor operating at 900 RPM and connecting through a V belt. The motor should be suited for 415 v + 10%, 50 Hz, 3 Phase AC supply, Capcity - 10 HP-02 Nos (1 working + 1 standby). Make : Crompton Greaves/Kirloskar/OEM approved with suitable capacity starter Make : Control & Switch gear/L&T/BCH/Havells/Schinider/OEM approved with overload protectection, panel for automatic switching of pumps. (c) Vacuum receiver : One No vacuum receiver of 1500 ltrs capacity, the receiver should be fabricated from MS plates as per IS:226 and manufactured as per IS:2825. The reservoir should be supplied with safty valve, pressure guage and drain valve etc, manufacturers test certificate to be provided. Receiver tank should have feature to pass autocut signal to the plant in case it is full. (d) Vacuum switch : Vacuum switch of 0-760 mm range should be provided, should have both NO/NC contacts and suitable for 230 v, 50 Hz AC supply. The vacuum switch should be housed in weather proof casing with 3/8" BSP gas service connection at the bottom of the assembly. (e) Vacuum filter : Two Nos vacuum filters with drain valve . This filters should be non ferrous and online. The discharge to atmosphere should be through micron filter catridge , and suitable capacity bactetia filter and secretion trap. (f) The medical vacuum plant shall be CE marked / ISO comprising of air cooled , oil lubricated rotary vane/reciprocating/vaccum pumps to provide a flow rate.
Supply, installation, testing and commisioning of Fully automatic Oxygen control panel with maximum input pressure 220 Bar, output pressure 4.2 Bar, flow capacity 1000 LPM, minimum three input points (Main, Backup, External Supply/Emergency case supply units/LMO), operating temperatures +10 to +45 degree C, digital LED display, Alarm, sound and as per technical specifications, standard medical practice and consisting of following features:- (a) Automatic control system consists of two stage regulators and consisting high pressure reducer panel , Alarm and control panel, left/right Ramp pressure sensors, pipe line pressure sensors, high pressure input valve, input filter, 315 bar input guage, high pressure body, pressure setup screw, high pressur reducer drain, high pressure gauges, 2nd stage regulator, regulator set up, automatic change over , automatic output pressure gauge in emergency outlet, backup system input, plant output regulators, pant output pressure guages, plant output connected piping, control/power wiring and all necessary arrangement complete and should comply Indian Medical Standards and comply standard : HTM 02-01/DIN/EN/ISO-7396-1 and should be CE certified. (b) Both first stage regulators in the oxygen control panel will have non halogenated polymer in the high pressure side to ensure that there will be no ignition due to adiabatic compression. (c) 40 micron filter should be provided at the inlet of each high pressure regulators of the oxygen control panel. (d) The first stage regulators will be connected to common 2nd stage regulator. The first stage regulator meant for first stage will capable of switchgear system incorporated fron "RUNNING to "RESERVE" bank due to differential pressure. (e) The control panel will provide for two individual content contact pressure gauges to indicate the cylinder pressure gauge to indicate the respective services. (f) The control panel will have built in audio visual signal lamp indications for bank change over. (g) The control panel will be covered with aesthetically suitable cover for safe operation indicating the respective services. (h) Control panel will have built in prtection system to ensure safe operation by low voltage and all protections of surge, overload and earth fault. The control panel shall include two pressure relief valves, one high pressure and one low pressure. (j) The panel should have the capacity to withstand maximum operating pressure of 220 bar for safty purposes. (k) The main control unit must be protected by a mild steel with epoxy powder coated with a viewing window to monitor the digital display. Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Supply , installation, commissioning and testing of Wall munted Digital area gas alarm panel two lines, with audio-visual alarms for each gas, running on electricity 220V. The gas alarm comprising of following :- (a) Two gas alarm (b) Individual gas status LED indicator (c) Auto alarm for low and high pressure (d) Dispaly of line pressure for all the services with factory calibrated pressure sensors (e) Alarm test/check/mute facility (f) Small and compact in design (g) Mounted on powder coated MS box (h) Nut and nipples are to be provided for connection with pneumatic supply line (j) Low voltage internal operation with ouput power supply of 220 V AC (k) The model should be IEC 60601-1-2 compliance (l) It should be compliant to ISO 7396-1/NFPA/99/HTM standards (m) The product should be BIS/CE certified. Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Supply, laying, commisioning and testing for copper pipes for oxygen line of following sizes, seamless, deoxidized, nonarsenical, half hard, tempered and degreased materials conforming to BS:EN:13348 and as mentioned below :- (a) Installation of piping should be carried out as per standard medical practice with atmost cleanliness (b) Only pipes, fittings and valves which degreased as per approved medical standards should be used (c) Pipe fixing metalic/PVC clamps suitable dia should be provided in every meter (d) Adequate supports shall be provided while laying pipelines to ensure that the pipes do not sag (e) Minimum copper content 99.90% Make : Mexflow/Mandev/Metalalloys Notes : (a) All brazing copper to copper joints shall be done by using brazing rod (5% silver copper phosphorous alloy) and copper to brass or gun metal shall be jointed by using brazing rod AG 203 (43% silver copper zinc brazing alloy. (b) Inert gas welding technique should be used by oxygen free Nitrogen gas inside copper pipes while brazing to avoid carbon deposition. (c) After erection, the pipes shall be flushed and then pressure testing shall be carried out. (d) All exposed pipes should be painted with two coats of synthetic enamel paint and colour codification should be as per IS-2379 of 1963. (e) Copper pipe passing through walls & floors should be pass through suitable sleeves. (f) Complete system layout sketch as per schedule will be prepared & submitted by the contractor to Enginner-in Charge before commencement of work.
(a) 12mm OD, 1.0mm thick.
(b) 15mm OD, 1.0mm thick.
(c) 22mm OD, 0.9mm thick.
(d) 28mm OD, 0.9mm thick.
(e) 42mm OD, 1.2mm thick.
Supply, laying, commisioning and testing for copper pipes for suction line of following sizes, seamless, deoxidized, nonarsenical, half hard, tempered and degreased materials conforming to BS:EN:13348 and as mentioned below :- (a) Installation of piping should be carried out as per standard medical practice with atmost cleanliness (b) Only pipes, fittings and valves which degreased as per approved medical standards should be used (c) Pipe fixing metalic/PVC clamps suitable dia should be provided in every meter (d) Adequate supports shall be provided while laying pipelines to ensure that the pipes do not sag (e) Minimum copper content 99.90% Make : Mexflow/Mandev/Metalalloys Notes : (a) All brazing copper to copper joints shall be done by using brazing rod (5% silver copper phosphorous alloy) and copper to brass or gun metal shall be jointed by using brazing rod AG 203 (43% silver copper zinc brazing alloy. (b) Inert gas welding technique should be used by oxygen free Nitrogen gas inside copper pipes while brazing to avoid carbon deposition. (c) After erection, the pipes shall be flushed and then pressure testing shall be carried out. (d) All exposed pipes should be painted with two coats of synthetic enamel paint and colour codification should be as per IS-2379 of 1963. (e) Copper pipe passing through walls & floors should be pass through suitable sleeves. (f) Complete system layout sketch as per schedule will be prepared & submitted by the contractor to Enginner-in Charge before commencement of work.
(a) 12mm OD, 1.0mm thick.
(b) 15mm OD, 1.0mm thick.
(c) 22mm OD, 0.9mm thick.
(d) 28mm OD, 0.9mm thick.
(e) 42mm OD, 1.2mm thick.
Supply and fix Zonal/Isolation Valve Box, MS powder coated & lockable 3mm thick front glass mounting easily visible and including pressure guage, brass body quarter turn ball valves using for opening & closing position, valve box door cannot be closed during valve closing position. In case of emergency the door can be glass break opened or by un-locking using the key complete all as specified and directed. Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Supply, installation, testing and commisioning of Isolation Valves as per CE certified/HTM-2022/02-01/DIN/ISO/BS EN 1057 or ball valves as per BS 1057, rated at 400 psig, as well as full vacuum (29.9" Hg). Valves go from full ON to full OFF by turnig the vinyl-gripped valve handles 90 degree locking type including handles complete all as specified and directed and suitable for following sizes of copper pipes:- Make : RN/JSI/Uttam
(a) 12mm OD.
(b) 22mm OD.
(c) 28mm OD.
(b) 42mm OD.
Supply installation, testing and commisioning of Oxygen outlet point terminated properly Double locking Front Loaded which have a parking facility (Parkodex) which also avoids inter changing of out let and Keys (Gas specific probes) pressure rating 4Bar as specified below:- Outlets shall be fitted with a 165 mm length Copper inlet pipe stub which is silver brazed to the outlet body. Body shall be of one piece brass construction. For positive pressure gas services, the outlet shall be equipped with a primary and secondary check valve and the secondary check valve shall have break safe mechanism and also comply to EN 737 pressure test standards and rated at minimum 200 psi in the event the primary check valve is removed for maintenance. The outlet assembly should have separate colour coding for each services and will accept only corresponding gas specific adaptors. All outlets shall be cleaned and de-greased for medical gas service, factory assembled and tested. The medical gas outlets should be of quick connecting and wall mounted modular type Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Supply installation, testing and commisioning of Vacuum outlet point terminated properly Double locking Front Loaded which have a parking facility which also avoids inter changing of out let and Keys (Gas specific probes) pressure rating 4Bar as specified below:- Outlets shall be fitted with a 165 mm length Copper inlet pipe stub which is silver brazed to the outlet body. Body shall be of one piece brass construction. For positive pressure gas services, the outlet shall be equipped with a primary and secondary check valve and the secondary check valve shall have break safe mechanism and also comply to EN 737 pressure test standards and rated at minimum 200 psi in the event the primary check valve is removed for maintenance. The outlet assembly should have separate colour coding for each services and will accept only corresponding gas specific adaptors. All outlets shall be cleaned and de-greased for medical gas service, factory assembled and tested. The medical gas outlets should be of quick connecting and wall mounted modular type Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Supply installation, testing and commissioning of oxygen Back Pressure Compensated flow meter with control range of 0 – 15 lpm (calibration within +/- 10% ) with 250 ml humidifier bottle made of unbreakable polycarbonate material and autoclavable at 121 degree Centigrade temperature.The flow meter shall be strict precision, durability standard and body shall be made of brass chrome plated materials.The flow tube and shroud components shall be made of clear, impact resistant polycarbonate.Flow Tube shall have large and expanded 0 – 5 lpm range for improved readability at low flows with Inlet filter to prevent entry of foreign particles. Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Suply, installation testing and commissiong of Ward suction unit or Ward Vacuum Unit with above 600 ml suction collection jar-1 Nos as per specifications mentioned below:- (a) The vacuum regulator should have a vacuum gauge with analog display.The scale should be in mbar or mmhg. (b) 1no of Suction Regulator and 1no of 600 ml polysulfone /polycarbonate collection jar, autoclavable at 121º C, unbreakable, fitted with an anti-overflow safety device and equipped with a plastic antibacterial filter and should be totally transparent, to ensure perfect sucked liquid visibility. (d) Should have vacuum levels: 0-760 mm of Hg and Should have vacuum gauge fitted with a protective bumper device. (e) Should have on/off knob allowing for the quick restoration of a readjusted vacuum level. (f) Must have central adjustment knob with a color coded for 0 to 760 mm of Hg. Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
Supply , install, testing and commisioning of Bed Head Panels horizontal, Powder coated, It should have the following features:- Minimum length 1200 mm, width 250mm, 2mm thick. Efficient, safe & Robust design in extruded aluminium section. Smooth curved surfaces, with acceptable colour choice Should have an integrated rail system to mount accessories Segregation of services i.e. low voltage supplies, high voltage supplies, and medical gases should be maintained throughout. Entire pipe line should run in continuous horizontal panels with no break for each unit & length as per area where it has to be installed. Facility as per under :- (a) Ward Vacuum unit clip - 01 Nos. (b) Modular Socket 15 Amp with switch -02 Nos. (c) Modular Socket 5 Amp with switch -02 Nos. . (d) Fixing arrangement for Oxygen Outlet - 01 Nos (e) Fixing arrangement for Vacuum Outlet - 01 Nos Note : 1. The quoted rate includes necessary mounting arrangements to fix the panel in wall/between pillar 2. Oxygen and Vacuum outlet shall be measured and paid seprately under respective item. Make : HHH(Hindustan Hospi Hub, Jalandhar)/MPS(MPS Project, New Delhi/Aktiv(Aktiv Technologies, Faridabad).
M&L for submain wiring with PVC insulated cable multistranded copper conductor FRLS two single core 2.50 Sqmm drawn through and including PVC rigid non metallic surface or concealed conduit medium grade of size not less than 25mm dia including earth continuity FRLS multistranded copper conductor 2.5 Sqmm PVC insulated with green insulation, connected to bed headed panels complete all as specified.
M&L for submain wiring with PVC insulated cable multistranded copper conductor FRLS two single core 6.0 Sqmm drawn through and including PVC rigid non metallic surface or concealed conduit medium grade of size not less than 25mm dia including earth continuity FRLS multistranded copper conductor 6 Sqmm PVC insulated with green insulation complete all as specified. Note for Srl item 13 & 14: Three runs of PVC insulated copper conductor S/C multistrandedwire & one run of non rigid PVC conduit shall be measured & paid as one unit.
S&F sheet metal enclosure for DBs for MCBs to be used, SPN 8 ways 240 V, with 200 Amps rated bus bar, double door, epoxy coated inside and outside complete all as specified.
Supply and fixing distribution board iron clad, vertical type, double door with IP-43 1K -09 protection suitable for MCCB TPN as incommer and MCB SP as outgoing 415 volts 3 phase 50 C/s 4 way , complete with appropriate size copper bus bar and neutral link complete including one MCCB TPN 415 volts 100 Amps rating with rupturing cap 16 KA of the same make as of distribution board & including cutting chases to wall for fixing DB and making good the disturbed wall suface all as specified and directed.
S&F in replacement MCB SP 5 to 32 Amps, 240V with rupturing capacity 10 KA, B Curve complete all as specified and directed.
S&F in replacement MCB SPN 32 Amps, 240V with rupturing capacity 10 KA, B Curve complete all as specified and directed.
M/S SATPAL AND BROTHERS
kailu construction co
CHOUDHARY AND SONS
Medical Eleborate Concept Pvt Ltd
GULSHAN SINGH GHAI AND SON
singh traders
M/S Vinod Kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .