Tender Value
₹2.1 L
EMD Value
₹4,290
Closing Date
29 Jul 2026, 2:00 pm
THE EXECUTIVE ENGINEER, APD DIVISION,PHE DTE
THE EXECUTIVE ENGINEER, APD DIVISION,PHE DTE
Laying of DI pipes from Lankapara 3no pump towards 8no line area at Lankapara TG PWSS, under Alipurduar Division P.H.E. Dte.
2026_PHED_1031673_4
NIeT No-29/ALD/2026-2027
Open Tender
CIVIL WORKS
ALIPURDUAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,290
Yes
10 Jul 2026
10 Jul 2026
31 Jul 2026
10 Jul 2026
29 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PHED_SOR_2019_Page--OH-13_It no.53
Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc. of approved quality and type all complete as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW rate).
b) 100mm dia. | 6 | Each | 182 | ₹1,092 |
| 2 | PHE SCHEDULE
Making C.I. Jeffy joint for all diameter. | 12 | Each | 101 | ₹1,212 |
| 3 | PHED_SOR_2019_Page--L-1_It no.- 1
Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clear cover from top of pipe is 1.10mtr. below existing ground level in any kind of soil including mixed with boulder, road sub-grade and its flank,but excluding moorum and laterite and stone etc.without damaging the exisiting telephone/electric cable etc.(in case of damaged if any type of cable line during excecution , necessary damaged charges as applicable by the respective authority will be borne by the gency in his own cost) preparing the bottom surface for continuous bedding of pipe line and laying pipes, fitting, fixing specials
and valves with bailing out water if any including carriage of pipes, specials and valves from local deptt. store within 8KM and back filling the trenches with excavated earth in layers to original condition as per specification and direction of EIC. The surplus materials after execution of work are to be return to the deptt. store. N.B: i) Any deviation from required clear cover of 1.10mtr., due to site adverse condition, prior permission is to be obtained from the EIC in exceptional situation and payment will be made on prorate basis over the rate of entire item
ii) No payment will be made without hydraulic test of the pipe line either part or full
iii) The pipes, specials and valves , rubber gasket will be supplied deptt. free of cost.
b) 100mm dia. | 320 | m. | 72 | ₹23,040 |
| 4 | PHED_SOR_2019_Page--L-15_It no.- 5
Making rubber gasket joint to CI/DI pipes maintaining proper alignment level etc. by mechanical arrangement with or without using mobile cranes where necessary and with help of all other equipments tools and tackles etc. as required providing lubricants of proved quality and direction of EIC. (rubber gasket will be supplied deptt. free of cost)
b) 100mm dia. | 59 | Each | 20 | ₹1,180 |
| 5 | Ordinary Cement concrete M-15 (Mix 1:1.5:3) with graded stone chips(20 mm.down) excluding shuttering and reinforcement, if any, in ground floor as per IS 456 - 2000. | 7 | Cum | 4,745 | ₹33,215 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups,binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape,placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete asper drawing and direction.
(a) For works in foundation, basement and upto roof of Ground Floor / 4m.
Other than SAIL/ TATA/RINL | 0.45 | MT | 91,726 | ₹41,276.7 |
| 7 | PWD_SOR(Bldg.)_2017 Page- 42 , It no.-36
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor) | 62 | Sqm | 205 | ₹12,710 |
| 8 | Making barricading for protecting the trench to avoid any accident including making arrangement of road light during the night. | 6 | each | 962 | ₹5,772 |
| 9 | Labour charges for repairing of UPVC pipe by using UPVC socket and solvent cement including earth work in excavation with dewatering and necessary tracing out the actual position of brusting / leakage, cutting the pipe to required length in the trenches and replacing the same with new pipe (as per required length) including fitting fixing after roughing the UPVC surface & supplying and applying solvent cement, back filling the trenches with excavated earth upto the same as per direction of EIC all complete (UPVC pipes and
specials, solvent cement to be supplied by the Agency). Unserviceable broken withdrawn surplus materials are to be deposited to the Deptt. store.
iii) 90 mm Dia). | 6 | each | 653 | ₹3,918 |
| 10 | iv) 110 mm Dia | 8 | each | 736 | ₹5,888 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.89 MB
Tendernotice_2.pdf
PDF • 21.31 MB
BOQ_2533382.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid