Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance | +14.00% | ₹15.2 L | L1 | Admitted-Finance |
| 2 | L2₹15.4 LAdmitted-Finance | +15.50% | ₹15.4 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical EMD not deposit |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical EMD not deposit |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical EMD not deposit |
Tender Value
Refer Docs
EMD Value
₹35,000
Closing Date
15 May 2026, 11:15 amClosed
Executive Engineer (EnM) M-8
Office of the Executive Engineer (EnM) M-8 Nangloi Phase-III, Near Maharaja Surajmal Stadium Metro Station New Delhi-110041.
Operation, Supervision, watch and ward of various site in AC-10.
2026_DJB_290968_1
NIT No.01 /EE(EnM)M-8/2026-27 Item 06
Open Tender
Civil Works
180 days
Nangloi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No SB 50448339804
₹35,000
Yes
19 May 2026
7 May 2026
15 May 2026
7 May 2026
15 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Maintaining of water supply by operation, Watch & Ward of all E&M equipment’s installed at Majra Nala On line Booster as per prevalent schedule supply time on daily basis as per direction of engineer in charge by operation of Moves, pump-sets. Valves and all electrical and mechanical equipment, electric control-panels, valves etc., maintaining of log-sheets, general cleaning, monitoring of flowmeter reading hourly via. Mobile/wats up message and photos, Opening of valves etc. The job includes minor maintenance i/e replacement of packing, kit Kat, tube/bulbs, switch/socket, fuse links, log books, asbestos graphite packing. Maintaining cleanliness, etc. valve repairing vent cover, minor electrical job works i/e periodic tightening of connections in panel ci board, cleaning of carbon deposits in panel/motor connection plate, phase sequence correction etc. Note: Spares / Material required for replacement in minor maintenance will be provided by the department. Total no. of staff deployed: 6 Nos. (Un-Skilled worker: 4 Nos. per day). (Semi-Skilled worker: 2 Nos. per day) Deployment of one number Unskilled labour per shift for operation/maintenance/watch and ward of E&M Installation at U Block Mangolpuri BPS in AC-10. Total staff to be deployed as under: - Un-skilled labour- 02 Nos. per day Semi-Skilled worker: 2 Nos. per day | - | days | 7,396 | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_386087.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid