| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹97.0 LAccepted-AOC WZ 250 B 2 GALI NO 08 SADH NAGAR I PALAM COLONY NEW DELHI 110045 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110045 | 1 | Accepted-AOC The M/s Imran Construction Co is being L1 accepted pl. | |
| 2 | 2nd₹98.7 L+₹32,828.20 (0.33%)Rejected-Finance | 2nd | Rejected-Finance Not Being L1 | |
| 3 | 3rd₹1.0 Cr+₹6.0 L (6.08%)Rejected-Finance 302 SIDDHIVINAYAK APPT A WING MUMBAI K K MARG JACOB CIRCLE MUMBAI CITY MAHARASHTRA 400 011 | MUMBAI | MAHARASHTRA | 400011 | 3rd | Rejected-Finance Not Being L1 | |
| 4 | 4th₹1.1 Cr+₹8.9 L (9.02%)Rejected-Finance | 4th | Rejected-Finance Not Being L1 | |
| 5 | 5th₹1.1 Cr+₹13.6 L (13.8%)Rejected-Finance 26 8 2 PUNE MUMBAI ROAD OPP B U BHANDARI SHOWROOM EKTA PARK SOCIETY WAKDEWADI PUNE 411 003 | PUNE | MAHARASHTRA | 411003 | 5th | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | the bhimani group of companies L3 | SLB Enterprises L4 | M/s S N Atiwadkar L2 | imran construction company L1 | vishalconstruction L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster on brick or stone walls etc including raking out joints hacking for key scrubbing down with water etc. | 3,650 | Sqm | 10 ₹36,500 Lowest | 30 ₹1,09,500 | 20 ₹73,000 | 15 ₹54,750 | 35 ₹1,27,750 |
| 2.00 | Demolition of brickwork or stone/boulder masonry, built in CM including all quoins arches pillars etc. | 10 | Cum | 500 ₹5,000 | 200 ₹2,000 | 500 ₹5,000 | 100 ₹1,000 Lowest | 550 ₹5,500 |
| 3.00 | M&L for Brickwork with fly ash bricks, straight or curved on plan exc 6m mean radius, built in CM 1:6 | 10 | Cum | 9,000 ₹90,000 | 4,500 ₹45,000 Lowest | 6,500 ₹65,000 | 6,500 ₹65,000 | 5,800 ₹58,000 |
| 4.00 | M&L for 15 mm thick cement mortar 1:6 on Brick or concrete surface finished even and smooth without using extra cement all as specified | 1,950 | Sqm | 290 ₹5,65,500 | 445 ₹8,67,750 | 200 ₹3,90,000 Lowest | 345 ₹6,72,750 | 222 ₹4,32,900 |
| 5.00 | M&L 15mm thick plastering on fair faces of bricks or concret surfaces finished even and smooth w/o using extra cement in cm1:4 | 1,000 | Sqm | 180 ₹1,80,000 Lowest | 445 ₹4,45,000 | 200 ₹2,00,000 | 350 ₹3,50,000 | 488 ₹4,88,000 |
| 6.00 | M&L for 05 mm thick cement plaster 1:3 on ceiling concrete surface finished even and smooth without using extra cement all as specified | 700 | Sqm | 100 ₹70,000 Lowest | 250 ₹1,75,000 | 170 ₹1,19,000 | 350 ₹2,45,000 | 200 ₹1,40,000 |
| 7.00 | M&L for two coat of oil bound distemper on 03 mm thick wall care putty on wall over plastered surfaces including prepartion of new surfaces on plastered surfaces, prepara-tory to distempering complete all as specified and directed | 1,950 | Sqm | 120 ₹2,34,000 | 110 ₹2,14,500 | 90 ₹1,75,500 | 85 ₹1,65,750 Lowest | 100 ₹1,95,000 |
| 8.00 | M&L for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces.
Note:- (a) MOU signed between Contractor and Paint Manufacturing company for Pre, during, and Post work completion site inspections shall be submitted by the contractor before the commencement of this work. | 1,000 | Sqm | 180 ₹1,80,000 | 140 ₹1,40,000 | 110 ₹1,10,000 Lowest | 110 ₹1,10,000 Lowest | 125 ₹1,25,000 |
| 9.00 | M&L for white wash three coats in ceilling incl prepration of new plastered surfaces. | 700 | Sqm | 45 ₹31,500 | 100 ₹70,000 | 25 ₹17,500 | 10 ₹7,000 Lowest | 35 ₹24,500 |
| 10.00 | M&L for preparation on old plaster surface and Washing (using jet wash), rubbing down and stopping of distempered surfaces on old plaster surfaces and applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over 3mm thick waterproof putty and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over old surfaces as directed by Engr-In-Charge.
Note:- (a) MOU signed between Contractor and Paint Manufacturing company for Pre, during, and Post work completion site inspections shall be submitted before the commencement of this work. | 453 | Sqm | 200 ₹90,600 | 140 ₹63,420 | 120 ₹54,360 Lowest | 150 ₹67,950 | 175 ₹79,275 |
Tender Value
₹1.3 Cr
EMD Value
₹2.0 L
Closing Date
31 Jul 2025, 6:00 pmClosed
Shri Vinay Kumar, IDSE, SE (SAG), CWE.
Headquarters Commander Works Engineer (Army) 24 Assaye Building, Colaba Mumbai-400 005
SPECIAL REPAIR TO OR MD ACCN BLDG NO P 244 OF MT COY 2 STC AT BAMBOLIM CAMP GOA
2025_MES_717200_1
85210/P/E8
Open Tender
Civil Works
Item Rate
270 days
PANAJI GOA
As per NIT
8 documents required · 8 mandatory
₹1,000
GE PANAJI GOA
₹2.0 L
Yes
30 Oct 2025
27 Jun 2025
2 Aug 2025
27 Jun 2025
31 Jul 2025
18 Jul 2025
27 Jun 2025 - 4 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .