Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹2.1 L (75.1%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹5.0 L+₹2.2 L (77.1%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹4,905
Closing Date
9 Mar 2021, 5:00 pmClosed
Commissioner M.Corp. Solan
Commissioner M.Corp. Solan
Channelization of Nallah near Mida house to bina house in ward no 13
2021_UDDHP_44675_1
6675-77,01/02/2021
Open Tender
Civil Works
Item Rate
90 days
M.Corp. Solan
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Commissioner M.Corp. Solan
₹4,905
30 Dec 2024
24 Feb 2021
10 Mar 2021
24 Feb 2021
9 Mar 2021
24 Feb 2021
Amount
Earth work in excavation for structures in all depths as per drawings and technical specification as per Clause 305.1(Three hundred Five point One) of MORD specifications 300 (three hundred) including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated Suitable materials.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing and laying cement concrete 1:6:12 (1 cement:6 sand :12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: Foundation and plinth. as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Cement concrete flooring 1:2:4 (1 cement : 2 sand:4 graded stone aggregate 20 mm nominal size)laid in one layer finished with a floating coat of neat Cement.50 mm thick.
Providing and Laying cement concrete 1:4:8 with 15% plams and curing complete including the cost of farmwork for plain/reinforced concrete in retaining walls, breast walls, the size of plum should be 150 to 300 mm as per drawing and HP.PWD technical specifications.
Providing form work with steel plates 3.15 (Three point One Five ) millimetres thick welded with angle iron in frame 30*30*5 (Thirty into Thirty into Five ) millimetres, so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden battens and ballies in all heights of propping and cantering below supporting floor to ceiling and removal of the same in-situ-reinforced concrete and plain concrete work as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges in: a) Flat surfaces such as soffits of suspended floors, roofs, landings and the like.
(b) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like.
Providing and laying cement concrete work 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in.Suspended Floor roofs, landing and shelves and their support balconies,beams, girders, bressumers and contilever upto floor twolevel
Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level.
Rahul Sharma
geeta Ram jaswal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .