Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
5 Oct 2020, 2:30 pmClosed
SE/GEDC
Office of the Superintending Engineer Gobi Electricity Distribution Circle, 110/11kv Gobi ss campus,vettaikarankovil, nagadevampalayam (po), Gobichettipalayam-638 476
Implementation of HVDS in 22 KV Reddipalayam feeder Fed from 110/22 KV Chennampatty SS in Ammapettai sub division
2020_EB_181597_1
ET No.41 dt 25.09.2020
Open Tender
Electrical and Maintenance Works
Works
45 days
SE/GEDC/GOBI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
15 Oct 2020
29 Sept 2020
6 Oct 2020
29 Sept 2020
5 Oct 2020
29 Sept 2020
Amount
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of Hard rock without blasting (where houses are located) FOR POLE
Excavation of Hard rock without blasting (where houses are located) FOR STAY
Erection of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Dismantling of RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of RCC poles/Metal poles upto 9.14m.(30') by using JCB or maual
Erection of stay set complete
Dismantling of stay set complete
Fixing of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Fixing of LT 3 phase cross arms
Dismantling of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Dismantling of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT shackle
Dismantling of LT shackle
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Fixing of Guarding Cross arm
Fixing of Tapping Channel Cross arm
Fixing of Earthing pole with pin including burying looping and binding.
Paving of conductor 7/3.35 mm ACSR 7/3.0 mm AAAC &7/2.59 mm ACSR 7/2.11 mm ACSR
Dismantling of conductor 7/3.35 mm ACSR 7/3.0 mm AAAC &7/2.59 mm ACSR 7/2.11 mm ACSR
Numbering of pole with paint and withbase painting.
Painting of RCC poles including of poles with colour cement.
b. Sleeve concreting including materials (Cement 1/2 bag + river sand and Blue metals and watering)
HT Guarding arrangements per span spilit neutral
Agricultural service fixing / service
Releasing of single phase service and re-fixing.
Alternation of Back clamp suit for works
Alternation of stay clamp suit for works
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Clearing of branches of trees
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of channel
Cutting of Angle
loading unloading and stacking All line materials such as structure materials , Cross arms ,Clamps,Bolt & Nut etc loading unloading and stacking
Transport of poles /Materials/ conductors Below 8 Kms.
Transport of poles/Materials/ conductors Above 8 Kms. For additional Km.
Transporting of Loading of poles upto 27'-0"
Loading of poles upto 30'-0"/RSJ Pole
Unloading of poles upto 27'-0"
Unloading of poles upto 30'-0"/RSJ Pole
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Erection of Transformer Loading or unloading of Transformer upto 100 KVA for each
Erection of New Transformer upto 100 KVA
Dismantling of New Transformer upto 100 KVA
Erection of douple pole new Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Erection of single pole new Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, poles, fixing of tapping x arm and angle (Except erection of Transformer)
Manufacturing of special type clamps for rail poles RS joists,tobolar pole special clamps for distribution transformer structure.
Erection of D.P. structure with AB switch top channel, cross brancing, HG fuse set, earthing painting, providing stay and pole concreting
Releasing of grills from RCC poles
Labour for erection of DT meter
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .