Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-AOC H NO 319 2 CUSMON QUEPEM SOUTH GOA | ₹23.0 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹23.1 L+₹10,761.75 (0.47%)Rejected-Finance H NO 243 TILAMOL QUEPEM GOA | QUEPEM | GOA | ₹23.1 L+₹10,761.75 (0.47%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹23.2 L+₹21,962.75 (0.96%)Rejected-Finance MALBHAT HEIGHT NO 18 1ST FLOOR PAJIFOND NEAR SBI BANK MARGAO GOA 403601 | MARGAO | SOUTH GOA | GOA | 403601 | ₹23.2 L+₹21,962.75 (0.96%) | L3 | Rejected-Finance 3rd Lowest |
Tender Value
₹22.0 L
EMD Value
₹43,926
Closing Date
5 Mar 2026, 1:00 pmClosed
Chief Officer
Quepem Municipal Council Quepem Goa
Improvement Construction of storm water drain at various places, Construction of road from Andy Fernandes house to Osvy Fernandes House at Movatibhat and Pathway from Main road to Samir Dalal house at Zoglamoddi in Ward No. 10
2026_MC_27881_1
QMC/MUN/TECH/2025-26/4836/7
Open Tender
Civil Works
Percentage
90 days
Zoglamoddi
Please refer Tender Notice
3 documents required · 3 mandatory
₹3,000
₹43,926
5 Aug 2026
20 Feb 2026
6 Mar 2026
21 Feb 2026
5 Mar 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50m lead. | 68.15 | m3 | 1,122 | ₹76,464.3 |
| 2Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed | |||||
| 2.01 | All kinds of soil | 232.71 | m3 | 286 | ₹66,555.06 |
| 3 | Transportation and carriage of materials (A) By tipper truck including loading, unloading and stacking (A) Lime,building rubbish, manure sludge, moorum excavated rock ( i ) Lime,moorum, building rubbish earth upto 5 km. | 232.71 | m3 | 201.81 | ₹46,963.21 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 67.09 | m3 | 2,211 | ₹1,48,335.99 |
| 5 | Supplying of laterite stone soling of size 150-200 mm size and murrum having P.I. Value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc.(Measurements shall be considered on finished item) . | 23.1 | m3 | 1,867 | ₹43,127.7 |
| 6Providing and laying in position cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40m nominal size) excluding cost of centering, shuttering and finishing: | |||||
| 6.01 | All works upto plinth level | 122.8 | m3 | 6,635 | ₹8,14,778 |
| 7Centering and shuttering including strutting, propping etc. and removal of formwork for: | |||||
| 7.01 | Foundations, footings, bases for columns and mass concrete. | 335.2 | m2 | 407 | ₹1,36,426.4 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_28327.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .