Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
27 Sept 2022, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/Salem EDC
SE/Salem EDC Udayapatty
East Division Karipatty Sub Division Work Contract
2022_EB_252126_1
EE/East/WC.011/2022-23
Open Tender
Electrical Works
Works
180 days
East division
EMD
2 documents required · 2 mandatory
₹0
₹5,000
3 Oct 2022
17 Sept 2022
28 Sept 2022
17 Sept 2022
27 Sept 2022
18 Sept 2022
Amount
Excavation of Pole/Stay pits
Excavation of pole pit up to 27”(8.0m) pole
Stay bit 4.5” to 5” depth
Excavation of pole pit up to 9.14 Mtr pole
Erection of Poles
RCC poles/Metal pole up to 8.00m (27’)
RCC poles/Metal pole up to 9.14.m(30’)(300 kg)
Erection of stay set complete
Fixing of line materials
HT V Cross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2
LT 3 Phase cross arm
LT single Phase cross arm
HT / LT TI Fitting
Fixing of HT Pin Insulators (11/22 KV)
Fixing of HT 22KV stain disc
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of knob
Paving and Stringing of conductor
7/3.35mm ACSR 7/3.15mmAAAC
7/2.59mm ACSR & 7/2.50mm AAAC
Erection of Transformer structure completed in all respects with wiring Earthing ,fixing of open type fuse units ,HT/LT/LAS and jumpering 3 Nos.Earth pits with tubs including painting of metal parts, structure poles ,fixing of top channel seating channel , belting angle Including Concreting( Except erection of transformer)
Transporting of Materials / Conductors and other materials (excluding loading & unloading charges)
Up to 8 kms
Above 8 kms For additional km
Loading & Unloading of poles
Loading of poles up to 27”
Unloading of poles up to 27”
Loading of Poles upto 30”and above including RSJ pole
Unloading of Poles upto 30”and above including RSJ pole
Loading of line Materials
Unloading of line Materials
Transporting of poles
Transporting of poles up to 27” from road side to pole pit up to 100 m
Transporting of Poles upto 30”and above including RSJ pole from road side to pole pit up to 100 m
Erection of Transformer
Loading of transformer 100KVA
Unloading of transformer 100KVA
Erection of transformer 63 to 200 KVA
Erection of Single Pole Structure, Fixing of Top Channel Seating including concreting
Service Connections
Releasing of Single Phase service wire and refixing
Releasing of Three Phase service wire and refixing
Erection of D.P structure with AB switch top channel , cross bracing ,Earthing, Painting, providing stay and pole concreting
Alteration of back / Stay clamp
Drilling of Holes in channel only etc ¾ & 1” per hole
Releasing of ACSR/AAAC conductor from conductor Drum & coiling for all sizes of conductor
Dismandling of Line Materials
Dismandling of pole & pole pit and loading unloading of grills 9 mtr (475+550+160+80+350/2=807.5
Dismandling of pole & pole pit and loading unloading of grills(7.5mtr & 8mtr)(390+450+160+80+250)/2=665
Dismandling HT V Cross arms / Channel Cross arms / Guarding Cross arm 3 1/2, 4 1/2
Dismandling of HT Pin Insulators (11/22 KV)
Dismandling of HT 22KV stain disc
Dismandling of HT/LT TI Fitting
Dismandling of 3 PH X arm
Dismandling of 1 PH X arm
Dismandling of Alu Knob
Dismandling of LT pin Insulator
Dismandling of LT Shackle Insulator
Dismandling of Stay set complete
Dismandling of Double pole Structure poles of top channel seating ch & AB switch , open type set
Dismandling of One pole Structure ,fixing of top channel seating
Dismandling of D.P structure with AB switch top channel , cross bracing ,Earthing, Painting, providing stay and pole concreting
Dismandling of transformer 63 to 200 KVA
7/3.35mm ACSR & 7/3.15mm AAAC Dismandling per kmr
7/2.59mm ACSR & 7/2.50mm AAAC Dismandling per Kmr
Concreting of pole including cost of jelly ,sand and cenent with a mixure of 1:3:6 (2 Ft lenth*2 Ft Width *2.5 Ft Hight)
Branch Tree cutting
Cutting of cocunut leaves per tree
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .