| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L Quoted ₹10.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.4 LRejected-AOC TAMIL NADU N | KANCHIPURAM | TAMIL NADU | 600069 | ₹11.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KAMATCHI INDUSTRIAL SERVICE | Aslor Tek |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete. | 68 | Rm | 1,87,476 ₹2.2 L | 1,67,144 ₹2.0 L |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 5 | M3 | 27,480 ₹32,426.40 | 24,505 ₹28,915.90 |
| 3.00 | Removing the spalled/distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface thoroughly with reebaklens fosroc acid/equivelent with all lead, lift, labour, etc., complete. | 41.8 | M2 | 25,247.2 ₹29,791.70 | 22,530.2 ₹26,585.64 |
| 4.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 578.55 | M2 | 6,364.05 ₹7,509.58 | 5,785.5 ₹6,826.89 |
| 5.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete. | 120.6 | M2 | 1,48,579.2 ₹1.8 L | 1,32,539.4 ₹1.6 L |
| 6.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 8.2 | M3 | 93,086.4 ₹1.1 L | 83,000.4 ₹97,940.47 |
| 7.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 410 | Kg | 45,100 ₹53,218 | 40,180 ₹47,412.40 |
| 8.00 | Providing PCC 1:4:8 using OP/PP cement with 20 to 12mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete. | 5.3 | M3 | 39,039.8 ₹46,066.96 | 34,810.4 ₹41,076.27 |
| 9.00 | Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc, complete. | 10.1 | M2 | 13,796.6 ₹16,279.99 | 12,301.8 ₹14,516.12 |
| 10.00 | Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, Labours, lead, curing, etc. complete. | 1.4 | M3 | 10,865.4 ₹12,821.17 | 9,688 ₹11,431.84 |
Tender Value
Refer Docs
EMD Value
₹8,300
Closing Date
2 May 2025, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Repair works to the damaged External Sewage Line area of Type 1 Quarters Block No. 1, 3, 4, 5, 8 and 17 at Analmin Nagar
2025_EB_545812_1
CE SE C TTPS Spec. No 67 25 26
Open Tender
Civil Works - Others
150 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,300
Yes
20 Feb 2026
15 Apr 2025
3 May 2025
15 Apr 2025
2 May 2025
15 Apr 2025
Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete.
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Removing the spalled/distressed RCC from the existing concrete to average thickness of 75mm disposal of debris with a lead of 1km and roughening the surface thoroughly with reebaklens fosroc acid/equivelent with all lead, lift, labour, etc., complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete.
Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete.
Providing PCC 1:4:8 using OP/PP cement with 20 to 12mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying and fixing of precast jolly, rate including cost of all materials, labour, lead, lift, etc, complete.
Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, Labours, lead, curing, etc. complete.
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Plastering with CM 1:5, 12mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete.
White washing two coats with shell lime including cost of all materials, labours, lead, lift, scaffolding, curing, etc. complete
Replacing the Western water closet of size 450mm white glazed earthware with 'P' trap with sand cushion and forming flooring alround the water closet using 20mm brick jelly in lime concrete and plastering with CM 1:3, 20mm thick including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing 6Kg/cm2 PVC pipe for sanitary arrangements of approved quality size of 110mm dia and 75mm dia including cost of specials, all other materials required labour, lead, lift, etc., complete. a) Toilet & bath Sewer line (110mm dia)
b) Kitchen line (75mm dia)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid