| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAdmitted-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹20.7 L | L1 | Admitted-Finance |
| 2 | L2₹21.0 LAdmitted-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | ₹21.0 L | L2 | Admitted-Finance |
| 3 | L3₹21.5 LAdmitted-Finance | ₹21.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWAPAN KUMAR AKHULI L1 | BABLU SINHA L2 | RINA ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Part A: Installation of 1000mm complete belt conveyor for a length of 90 metre at CM 3 Panel 7A | ||||||
| 1.01 | Transportation of one 6.6KV VCB, DOL HT Starter from 8L/1D to 47Dip/-3L after loading it on MUV then unloading and placing manually on the platform | 1 | WORK | 46,761.83 ₹46,761.83 | 47,411.82 ₹47,411.82 | 48,632.3 ₹48,632.30 |
| 1.02 | Transportation of 250 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground ( sl.no.- 21 in committee report, rate/ length =32838.4 / 250 =131.35 ) | 1 | WORK | 40,299.28 ₹40,299.28 | 40,859.44 ₹40,859.44 | 41,911.25 ₹41,911.25 |
| 1.03 | Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV | 1 | WORK | 98,362.93 ₹98,362.93 | 99,730.17 ₹99,730.17 | 1,02,297.45 ₹1.0 L |
| 1.04 | Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV | 1 | WORK | 47,421.68 ₹47,421.68 | 48,080.84 ₹48,080.84 | 49,318.55 ₹49,318.55 |
| 1.05 | Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV | 1 | WORK | 46,310.23 ₹46,310.23 | 46,953.94 ₹46,953.94 | 48,162.64 ₹48,162.64 |
| 1.06 | Transportation and installation of Tail-end Unit Complete at CM panel 7A with the help of MUV | 1 | WORK | 17,505.27 ₹17,505.27 | 17,748.59 ₹17,748.59 | 18,205.48 ₹18,205.48 |
| 1.07 | Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1000mm structures is 0.085 Te/mtr.) | 1 | WORK | 1,41,709.31 ₹1.4 L | 1,43,679.07 ₹1.4 L | 1,47,377.68 ₹1.5 L |
| 1.08 | Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop) | 1 | WORK | 57,046.5 ₹57,046.50 | 57,839.45 ₹57,839.45 | 59,328.36 ₹59,328.36 |
| 1.09 | Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt. | 1 | WORK | 3,442.54 ₹3,442.54 | 3,490.39 ₹3,490.39 | 3,580.24 ₹3,580.24 |
Tender Value
₹20.7 L
EMD Value
₹25,900
Closing Date
26 Dec 2025, 11:00 amClosed
Area Engineer EnM
Office of the General Manager, Jhanjra Area, ECL
Transportation, Installation, Commissioning, Necessary Fabrication and Trial run including Civil work of one 1000 mm width 2x150KW, 6.6KV PVC Belt Conveyor for a length of 90 mtr. from 12XR/-2L to 12XR/12L CM 3 Panel 7A along with heightening at -2BL
2025_ECL_349397_1
ECL/GM/JNR/EnM/A2/25-26/103 dated 12.12.2025
Open Tender
Miscellaneous Works
45 days
Jhanjra UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹25,900
19 Jan 2026
15 Dec 2025
27 Dec 2025
15 Dec 2025
26 Dec 2025
16 Dec 2025
15 Dec 2025 - 22 Dec 2025
Amount
Part A: Installation of 1000mm complete belt conveyor for a length of 90 metre at CM 3 Panel 7A
Transportation of one 6.6KV VCB, DOL HT Starter from 8L/1D to 47Dip/-3L after loading it on MUV then unloading and placing manually on the platform
Transportation of 250 mtr., 6.6KV grade 120 Sq.mm armoured cable from surface to cm panel with the help of MUV and laying and hanging it at underground ( sl.no.- 21 in committee report, rate/ length =32838.4 / 250 =131.35 )
Transportation and installation of drive head Complete with Drive Drum, Driven Drum, Gear Box, Motor, Couplings, Bearing Blocks, Fenching etc. to CM panel with the help of MUV
Transportation and installation of Discharge Unit Complete with Cleaner at CM panel with the help of MUV
Transportation and installation of Loop Take-up Unit Complete with fencing at CM panel with the help of MUV
Transportation and installation of Tail-end Unit Complete at CM panel 7A with the help of MUV
Transportation and installation of 90 mtr. of belt structure, after loading it on MUV at CM panel (weight of 1000mm structures is 0.085 Te/mtr.)
Transporting, laying, lapping & jointing of 200 mtr. of belting (20 mtr. belt in loop)
Laying of Sequence cable(100m), pull cord, lockout cable and audio cable throughout the belt line of 90 metre. Fitting of pull chord switches and communication devices along the belt.
Supply of M.S. Nut & Bolt 5/8x2"
Supply of G.I. wire 8 SWG (for signalling system)
Supply of Bobin insulator (for signalling system)
Supply of industrial oxygen cylinder(7.1cum)
Supply of DA cylinder(6.2 cum)
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Part B: further installation of same 1000mm wide PVC belt conveyor for a length of 460 mtr. InCM 3 Panel 7A R-V seam, 12XR/-2L to 12XR/12L section at MIC
Transportation and Installation of 460 mtr. of belt structure, after loading it on MUV from surface(weight of 1000mm structures is 0.085MT/mtr.)
Transporting, laying, lapping & jointing of 920mtr. of belting
Shifting and installation of tail end for every shifting (wt =0.945*13 Te=12.285Te)
Installation of pull cord ,signalling and lock out devices
Supply of M.S. Nut & Bolt (M16x40)
Supply of G.I. wire 8 SWG (for signalling system)
Supply of Bobin insulator (for signalling system)
Supply of M.S. Nut & Bolt 3/8''x 3" with washer
Part C: Heightening of T6 Belt Conveyor(50pairs structure) at CM 3 Panel 7A in RV seam including necessary fabrication jobs and required alignment
Transportation of 50pair of ISMC 150 channels from surface to installation site at UG with the help of MUV (50 pair channels of 3 mtr. length each required for heightening)
Heightening of 12XR Belt conveyor with the help of Chain Pully Block along -12XR and fabrication of the structure of 12XR belt through gas cutting, adding channels vertically, and aligning it
Supply of M.S. Nut & Bolt 5/8x2"
Supply of industrial oxygen cylinder(7.1cum)
Supply of DA cylinder(6.2 cum)
Total impact of GST for the purpose of CTC
BABLU SINHA (BID ID -1205517)
RINA ENTERPRISE (BID ID -1205605)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_362137.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid