Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-Finance | L1 | Accepted-Finance Lowest quatation | |
| 2 | L2₹6.0 L+₹18,854 (3.25%)Rejected-Finance | L2 | Rejected-Finance Highest quatation |
| Sl No | Description | Qty | Unit | Vinothkumar L2 | A.G.Iyappan L1 |
|---|---|---|---|---|---|
| 1.00 | arth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mixed with 50% fair-sized boulders etc., with initial leads and lift including laying, spreading, leveling, sectioning, breaking clods etc., as per SS 20 A and all other incidental charges etc., complete as per standard specification. | 20 | m3 | 250 ₹5,000 | 246 ₹4,920 Lowest |
| 2.00 | Filling in foundation and basement with clear river sand including cost and conveyance of all materials and labour charges for filling and all other incidential charges etc,. Complete | 13 | m3 | 594 ₹7,722 | 584 ₹7,592 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing laying curing the concrete with water and all other incidentals charges etc complete as per standard specification. | 5.5 | m3 | 5,889 ₹32,389.5 | 5,879 ₹32,334.5 Lowest |
| 4.00 | Brick work in cm 1:5 using country bricks of size 8 ¾”x 4 ¼” x 2 ¾” including cost and conveyance of all materials to site and all labour charges and all other incidental charges etc. Complete as per standard Specification 10 m3 | 7 | m3 | 7,256 ₹50,792 | 7,245 ₹50,715 Lowest |
| 5.00 | Supplying and erecting of centring and shuttering including cost and conveynce of all materials to site and all labour charges etc. complete column surface | 21 | m2 | 1,237 ₹25,977 | 1,226 ₹25,746 Lowest |
| 6.00 | with strutting | 70.5 | m2 | 929 ₹65,494.5 | 919 ₹64,789.5 Lowest |
| 7.00 | Without strutting | 18 | m2 | 469 ₹8,442 | 459 ₹8,262 Lowest |
| 8.00 | Supplying and fabrication of steel for all reinforced cement concrete work and placing in position directed by the departmental officers including cost of steel and binding wires and all labour charges etc., complete (Upto 16mm dia) | 1,300 | kgs | 99 ₹1,28,700 | 89 ₹1,15,700 Lowest |
| 9.00 | RCC 1:1.5 :3 using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges and all other incidental charges etc,. Completion for foundation and basement. | 15 | m3 | 9,398 ₹1,40,970 | 9,387 ₹1,40,805 Lowest |
| 10.00 | Supplying and fixing over the floors best quality of scratch proof ceramic tiles set in cm 1;3 with full depth of pointing | 24.92 | m2 | 1,079 ₹26,888.68 | 1,069 ₹26,639.48 Lowest |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
29 Aug 2025, 4:00 pmClosed
Executive officer
Executive officer Parangipettai TP
Construction of Resting shed at ward no 17 Agaram Railway main road in Parngipettai Town Pnachayat
2025_DTP_596862_2
109/2025/A2
Open Tender
Civil Works
Works
90 days
Parangipettai TP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
Yes
3 Sept 2025
24 Aug 2025
29 Aug 2025
24 Aug 2025
29 Aug 2025
24 Aug 2025
Amount
arth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mixed with 50% fair-sized boulders etc., with initial leads and lift including laying, spreading, leveling, sectioning, breaking clods etc., as per SS 20 A and all other incidental charges etc., complete as per standard specification.
Filling in foundation and basement with clear river sand including cost and conveyance of all materials and labour charges for filling and all other incidential charges etc,. Complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing laying curing the concrete with water and all other incidentals charges etc complete as per standard specification.
Brick work in cm 1:5 using country bricks of size 8 ¾”x 4 ¼” x 2 ¾” including cost and conveyance of all materials to site and all labour charges and all other incidental charges etc. Complete as per standard Specification 10 m3
Supplying and erecting of centring and shuttering including cost and conveynce of all materials to site and all labour charges etc. complete column surface
with strutting
Without strutting
Supplying and fabrication of steel for all reinforced cement concrete work and placing in position directed by the departmental officers including cost of steel and binding wires and all labour charges etc., complete (Upto 16mm dia)
RCC 1:1.5 :3 using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges and all other incidental charges etc,. Completion for foundation and basement.
Supplying and fixing over the floors best quality of scratch proof ceramic tiles set in cm 1;3 with full depth of pointing
Plastering with cement mortor 1:5 - 12 mm thick including cost and conveyance of all materials to worksite and all labour charges etc., complete.
Ceiling Plastering with cement mortor 1:3 - 10 mm thick including cost and conveyance of all materials to worksite and all labour charges etc., complete.
Painting the wall surfae using Emulsion paint in two coats including cost of all materials to work site and all labour charges etc.,
Vinothkumar (BID ID -1442392)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .