Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance 52 58 198 144 | -14.99% | ₹3.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.3 L+₹34,975.68 (11.8%)Admitted-Fee/PreQual/Technical/Finance | -4.99% | ₹3.3 L+₹34,975.68 (11.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹3.3 L+₹34,975.68 (11.8%)Admitted-Fee/PreQual/Technical/Finance | -4.99% | ₹3.3 L+₹34,975.68 (11.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
20 Aug 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E1/4399/2026 Providing Greenary Arrangements Centremedian at Puzhuthivakkam Railway Station in Division -186, Unit - 42, Zone - 14.
2026_CoC_692189_1
Z.O.XIV.C.NO.E1/4399/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹3,500
21 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and filling in foundation, basement,...tion and as directed by the departmental officers. | 180 | CUM | 252.32 | ₹45,417.6 |
| 2 | Earth work excavation for foundation in all kinds ...nd removal of excavated earth from site complete) | 42 | CUM | 260.79 | ₹10,953.18 |
| 3 | Supply & stacking of red earth at site to the depa...tacking and inclusive of all taxes etc., complete. | 27 | CUM | 3,750 | ₹1,01,250 |
| 4 | Supply of well decomposed Farm yard Manure in a po... highly nutrient and which supports plant growth. | 27 | CUM | 2,400 | ₹64,800 |
| 5 | Mixing charges of Red soil, sand and manure unifor...ation of soil mixture (excluding material cost) | 54 | CUM | 116 | ₹6,264 |
| 6 | Supply of Coir Pith including cost of transport...ion, loading, unloading, stacking etc., complete. | 2,000 | KGS | 10 | ₹20,000 |
| 7 | Planting of Canna indica varigated Plant foliage s...vated earth etc as directed by the site in-charge. | 100 | EACH | 65 | ₹6,500 |
| 8 | Planting of Dracena babydoll ornamental foliage s...vated earth etc as directed by the site in-charge. | 100 | EACH | 116.7 | ₹11,670 |
| 9 | Planting of Heliconium foliage shrub variety of ...vated earth etc as directed by the site in-charge. | 100 | EACH | 76 | ₹7,600 |
| 10 | Planting of Ixora ordinary foliage shrub variety ...vated earth etc as directed by the site in-charge. | 100 | EACH | 64 | ₹6,400 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_832271.xls
BOQ • 0.32 MB
4399.pdf
Tender Documents • 1.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .