| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance BID IN ORDER |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
10 Oct 2022, 2:00 pmClosed
The Additional Chief Engineer/KEDC/Kanchipuram
The Additional Chief Engineer Kanchipuram Electy. Distn. Circle No. 1 Vellore Road, Olimohamedpet, Annamaaligai, Kanchipuram. - 631502
Providing Fire Protection wall in Palavakkam 33/11KV SS and providing G.I chain link fencing at Nungambakkam 33/11KV LT SS premises.
2022_EB_251195_1
ACE/KEDC/KPM/OT.9/22.23(Civil)
Open Tender
Civil Works
Works
30 days
The Additional Chief Engineer/KEDC/Kanchipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,100
13 Oct 2022
12 Sept 2022
11 Oct 2022
12 Sept 2022
10 Oct 2022
12 Sept 2022
12 Sept 2022 - 30 Sept 2022
Amount
Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m including cost of all leads, lifts, labour for applying as per standard specification. In Hard Gravely Soil
Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification
Laying plain cement concrete 1:3:6 using 12-20mm HBG metel for foundations including cost of Shuttering all materials, lead, lift and labour for laying concrete etc..
RCC M25, using 12 to 20 mm HBG machine crushed metal for plinth beam with formwork including cost of all materials and all lead, lift ,labour, curing etc., complete but excluding cost of steel reinforcement. Foundation &Basement - Raft.
RCC M25, using 12 to 20 mm HBG machine crushed metal for plinth beam with formwork including cost of all materials and all lead, lift ,labour, curing etc., complete but excluding cost of steel reinforcement. Foundation &Basement - Side wall.
Supply, fabrication and placing reinforcement for all R.C.C. works including cost of steel and all lead, lift, labour for cutting, bending and placing reinforcement as per plan and tying with binding wire and including cost of binding wire, labour and work at all levels etc., complete.
Plastering with CM 1:3, 20mm thick for Fire protection wall including cost of labour and material work at all levels etc., complete.etc.
Painting the outside walls with two coats of best quality exterior emulsion of approved colour over one coat of weather proof primer including cost of all materials, scafolding, lead, lift etc complete.
Earth work excavation in all type of soils with an initial lead of 10m and lift of 2m including cost of all leads, lifts, labour for applying as per standard specification.
Laying PCC 1:3:6 using 12-20mm HBG metel for foundations including cost of Shuttering all materials, lead, lift and labour for laying concrete etc..
Supplying and fixing of MS L-Angles for fencing the Power Transformer incluidng the cost of cutting bending,fabrication, transporting, Labour and painting lead, lift, etc., complete.
Supplying and fixing of GI Chain Link - 2" x 2" using 10 Gauge Galvanised Iron Wire (of all sizes) type confirming to ISI specification 278 / 1982 including cost of all materials, labour charges for laying, tensioning , cost of GI binding wire, hire charges for T&P, lead, lift etc., complete.
SGST PERCENTAGE IN FIGURES
CGST PERCENTAGE IN FIGURES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .