| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 CrAccepted-AOC 402 3RD FLOOR DEV PALACE M G ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹17.0 Cr Quoted ₹18.1 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.7 CrRejected-AOC NEW NO H 98 1 PERIYAR NAGAR ERODE 638 001 | ERODE | TAMIL NADU | 638001 | ₹18.7 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹19.0 CrRejected-AOC NO 123 FIRST STREET URC NAGAR SMALL SENGODAMPALAYAM ERODE DISTRICT 638012 | ERODE | TAMIL NADU | 638012 | ₹19.0 Cr | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Smart Infratech Developers L3 | GMS Elegant Builders I Pvt Ltd L2 | M/S SAMRI INFRA DEVELOPERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness Reinforced Cement Concrete etc complete complying with standard specifications and as directed by the departmental officers. | 136.38 | Cu.m | 4,869 ₹6.6 L | 4,783 ₹6.5 L | 4,650 ₹6.3 L |
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness Pressed tiles & weathering course etc complete complying with standard specifications and as directed by the departmental officers. | 140.81 | Sq.m | 52 ₹7,322.12 | 51 ₹7,181.31 | 50 ₹7,040.50 |
| 3.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness Doors & windows including removal of frames, hinges and fastenings etc complete complying with standard specifications and as directed by the departmental officers. | 479.68 | Sq.m | 174 ₹83,464.32 | 170 ₹81,545.60 | 165 ₹79,147.20 |
| 4.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Brick / stone masonry in lime mortar walls under 3m high, etc complying with standard specifications. | 712.01 | Cu.m | 320 ₹2.3 L | 314 ₹2.2 L | 305 ₹2.2 L |
| 5.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness Plain Cement Concrete etc complete complying with standard specifications and as directed by the departmental officers. | 35.44 | Cu.m | 549 ₹19,456.56 | 540 ₹19,137.60 | 525 ₹18,606 |
| 6.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 2,547 | Cu.m | 401 ₹10.2 L | 394 ₹10.0 L | 380 ₹9.7 L |
| 7.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. | 236 | Cu.m | 223 ₹52,628 | 219 ₹51,684 | 210 ₹49,560 |
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 125 | Cu.m | 5,807 ₹7.3 L | 5,705 ₹7.1 L | 5,550 ₹6.9 L |
| 9.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 269 | Cu.m | 171 ₹45,999 | 168 ₹45,192 | 160 ₹43,040 |
| 10.00 | Supply and filling in foundation and basement with Gravel with a lead of 0-5 km in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 239 | Cu.m | 544 ₹1.3 L | 535 ₹1.3 L | 520 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹8.4 L
Closing Date
20 Jun 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, PWD, BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE, COIMBATORE
Construction of 50 Bedded Critical Care Block Building in Government Hospital at Udumalpet in Tiruppur District
2025_PWD_561781_1
10BCMCBE13052025
Open Tender
Civil Works - Buildings
Udumelpet
Please refer Tender Documents
14 documents required · 14 mandatory
₹0
₹8.4 L
20 Nov 2025
26 May 2025
20 Jun 2025
26 May 2025
20 Jun 2025
26 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.68 MB
Tenderdocument.pdf
Tender Documents • 0.28 MB
Tenderdocument_2.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid