Bengaluru East City Corporation
Jagadeesh M
Construction of Kalyani in Vibhuthipura Lake in ward no 24 Vignan nagar
BECC/2026-27/OW/WORK_INDENT278
BECC/2026-27/OW/WORK_INDENT278
Open
Other Works
Two Tender Document System(Two Cover)
BECC HAL Airport Division
6 documents required · 6 mandatory
Mandating satisfactory completion as a prime contractor for at least one Similar work to an extent of 50% of the cost of the work
List of existing commitments and ongoing works
List of works for which tenders already submitted
BID capacity
achieved in at least two financial year a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.35.00Lakhs (usually not less than the estimated annual payments under this contract).
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor reports for the last five years
List of Financial Resources with Certificates
Registration Certificate (License)
PWD Registration Certificate
GST Registration Certificate
₹740
₹70,000
3 Aug 2026
3 Aug 2026
12 Aug 2026
6 Aug 2026
6 Aug 2026
Construction of Kalyani in Vibhuthipura Lake in ward no 24 Vignan nagar
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, cauti...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Cod...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Providing and laying water proofing treatment to the Retaining wall area with PU Elastomeric Single component liquid applied, cold applied, moisture cured high tensile elastomeric PU waterproofing mem...
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel et...
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direct...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture i...
Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and t...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50...
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel et...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and m...
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kankar/Moorum. (Tipper 14 m3) as per direction of engineer in charge.
Cost of Haulage Excluding Loading and Unloading Case-1 : Surfaced Road Taking output 25 tonnes load and lead 10 km = 250 t.km as per direction of engineer in charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
tnd notification 3 hal.docx
Instructions to Tenderers • 0.07 MB
KW 03-28.doc
Tender Document • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .