Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.6 LAccepted-AOC | ₹81.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹81.6 LRejected-AOC | ₹81.6 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Dacument not ok |
Tender Value
₹81.6 L
EMD Value
₹8.2 L
Closing Date
16 May 2026, 12:00 pmClosed
Executive Officer N P Jahangirganj
Office Nagar Panchayat Jahangirganj Ambedkar Nagar
Nagar Panchayat Jahangeerganj Ward no.07 me Sikandarpur road ke kinare bayi patri par bawali chauk se purani bazar road chaurahe tak nala nirman ka karya.
2026_DOLBU_1139591_1
29/NPJ/E Tender2026-27 DATE-20/04/2026
Open Tender
Construction Works
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,632
Executive Officer Nagar Panchayat Jahangirganj
₹8.2 L
Yes
1 Jun 2026
21 Apr 2026
18 May 2026
21 Apr 2026
16 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth v‹ork in excavation in foundation in ordinary soil Ï/C lift upto 1.50 mtr. 8 lead upto 50.00 mtr and dressing of sidcs and ramming of bottom and disposal of surplus excavatcd earth as directed bu the E/l within
a distancc of 50 m. (as Oer SI No. 251) nala retaning wall | 1 | m³ | - | - |
| 2 | Disposal of excavated material from site upto 5 Km Qty of same as above item 1 @70% | - | m³ | - | - |
| 3 | Providing and laying in cement concrete 1:3:6 (ferment:3 coarse sand:6graded Stone ballast aggregate 2D mm nominal size) and curing complete, including cost of form work in foundation and floors As
per PWD-279A nala retaing wall | - | m³ | - | - |
| 4 | R.C.G work with cement approved course sand and 2 cm (3/4“) gauge approved stone ballast in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and bending the same with 24 B.W.G.G.I. binding wire and including neccessary centering and shuttering etc. and also including supply of all materials, labours and T & P etc. required for proper completion of the work. Binding wire cost being
included in the item nala cover retaning wall | - | m³ | - | - |
| 5 | steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over
lapginq and hookes.rcc qty @1% in Nala rcc qtl @2% in retaing wall | - | qtl | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 36.16 MB
BOQ_2127787.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid