Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC STAKMO | ₹5.8 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹7.3 L+₹1.5 L (26.4%)Rejected-AOC | ₹7.3 L+₹1.5 L (26.4%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
| 3 | L3₹7.9 L+₹2.2 L (37.4%)Rejected-AOC | ₹7.9 L+₹2.2 L (37.4%) | L3 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹5.8 L
Closing Date
21 Oct 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of chain link fencing at Kuri village Nubra
2022_RDD_7874_5
NIT 35 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
27 Dec 2022
30 Sept 2022
22 Oct 2022
30 Sept 2022
21 Oct 2022
30 Sept 2022
Amount
Earth Work:- E/W in excavation by mechanical means (Hydraulic excavator) in foundation, trenches, drains ,pipes etc (not exceeding 30cm in depth. 1.5 mtr in width as well as 10m² of on plan)including disposal of excavated earth, lead up to 50 mtr and lift 1.50 mtr, disposed earth to be leveled and neatly dressed.(All kind of soil)
Providing & Laying dry stone soling of any thickness in horizontal level including cost of stone.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level 1:2:4(1cement 2coarse sand:4 graded stone aggregate 20 mm nominal size) Nallah.
Supplying of site angle Iron post &Struts of required size including bottom to be split & bend at right angle in opposite direction 10cm length & drilling Holes upto 10mm dia etc. Complete Equal Angle From post (40 x 40 x 6)
Centering and shuttering including strutting, propping etc and removal of form works.
Providing & Fixing (4” x 4”) wire mesh of (25’ x 5’) complete job.
Carriage of cement by mechanical transport from leh to Kuri Nubra an average distance of 153k.m including cost of loading, un loading and stacking(78.40begs) i.e 3.97MT
Carriage of stone aggregate sand and soling stone by mechanical transport an average distance of 15 km. including cost of loading, un loading and stacking
Carriage of stone from & average lead of 5km by mechanical transport.
M/S PADMA YANGZOM
M/S STANZIN YONTEN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .