| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 CrAccepted-AOC KANCHAUSI BAZAR KANPUR DEHAT | ₹11.7 Cr | L1 | Accepted-AOC Low Rate |
| 2 | L2₹12.5 CrRejected-Finance 0 ABHISHEK ENTERPRISES CHARWA PACHIMTHOK KAUSHAMBI UTTAR PRADESH 212203 | KAUSHAMBI | UTTAR PRADESH | 212203 | ₹12.5 Cr | L2 | Rejected-Finance High Rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| 5 | Rejected-Technical MAINPURI | UTTAR PRADESH | 209720 | - | - | Rejected-Technical Non-responsive |
Tender Value
₹12.5 Cr
EMD Value
₹25.1 L
Closing Date
21 Feb 2025, 12:00 pmClosed
SE Kanpur
SE Kanpur Circle PWD 16/22 Civil Lines Kanpur
Widening and Strengthening of Jhinjhak Kanchausi Canal Patri Road (ODR) upto 3.00 meter to 5.50 meter (including 05 years maintenance.)
2025_CEKNP_991661_1
7580C/131C-KV/2024 DT. 30.12.2024
Open Tender
Civil Works - Roads
365 days
Kanpur Dehat
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹7,714
₹25.1 L
Yes
SE Kanpur Circle PWD 16/22 Civil Lines Kanpur
17 Mar 2025
13 Jan 2025
21 Feb 2025
13 Jan 2025
21 Feb 2025
13 Jan 2025
17 Jan 2025
Amount
Clearing jungle including up rooting of trunk vegetations grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters outside the periphery of area cleared.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (MORT&H 3.16).(5 km Carted Earth)
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m technical specifications Clause 301 (MORT&H 3.06).
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m technical specifications Clause 301 (MORT&H 3.06) (Compaction only)
Construction of Granular sub base by providing Close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting Vibratory roller to achieved the desired density. complete as per clause 401. (Grading-1 Material) (MORT&H 4.01) (B) By Plant Mix Method
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (MORTH 4.14)
(1) Emulsion Treated Aggregate Base (Wet Mix Macadam + OPC Cement + Emulsion SS-2) As per MORTH Second revision 2019. Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mecahnical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement and 3.5% Emulsion in uniform single layer on sub-base/subgrade and compacitng with the road roller to achieve the desired density. (MORTH 406 & 4.1.4).
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (MORTH 5.02) (i)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant 120 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (MORTH 5.05 (B)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Sl.No.3.18)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (MORTH 9.03)
Providing (RCC M 25 Grade) concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 1500, 1700 & 2100 (Morth 12.08) (E) (Case II) RCC Grade M25 using batching plant transit mixer & manual placing
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications - 1600. (MoRT&H no. 12.42)
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. complete as per direction of engineer in charge and MoRT&H Technical Specification Clause (MoRT&H 13.08)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (MoRT&H 13.10)
Providing and Fixing of 350 mm dia Single Barrel Hume Pipe Gule
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. (Lko SOR Ch.26 Sl.No.2)
Road Marking with Hot Applied Thermoplastic Compound with Refletorising Glass Beads on Bituminous Surface (Repeated / Tranvers Bar). Providing & laying of hot applied Thermoplastic compound 5 mm. thick including Reflectorising glass beads @ 500 gms. per sqm area, thickness of 5 mm. is exclusive of surface applied glass beads as per IRC : 35-2015. The finished surface to be level, uniform & free from streaks & holes. (Lko SOR Ch.26, Sl.No.3)
Supply, fixing and erection of built up cantiliver structure of 6M span comprising of one vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical memeber welded with 10 mm MS plate at top & 12mm MS plate at bottom. The horizontal truss shall comprising of 50 mm dia heavy class MS pipe and 40 mm dia heavy MS pipe as bracing & 10 mm MS plate at bottom for fixing to vertical post as per structure design & drawing with one of steel primer and two coats of synthetic enamel paint. The work includes construction of RCC Foundation of size 0.90 x 0.90 mm of required depth as per site condition for builtup structure including Earth work in excavation 100 mm thick Lean Concrete in 1:4:8 (cement coarse sand and 40 mm gauge S.B.) RCC with 1:2:4 (cement, caorse sand and 20 mm stone grit) including supply and fixing of 25 mm dia Foundation Bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering.
Providing & fixing of Refective Signs with a corrosion resistant 4 mm thick aluminium composite panel face to be fully covered with High Intensity prismatic sheeting type IV as per IRC 67:2010 retro reflective sheeting with MS angle frame of 35x3 (Lko SOR Ch.26 Sl.No.10)
Providing & fixing of retro-reflectorised cautionary mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting wide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mmX75mmX6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45 cmX45cmX60cm, 60cm below ground level as per approved drawing. (as per IRC:67-2012 clause 14.60) : Intersection Ahead (90 cms Eqatriangle) Sl.No.18(i)
Providing & fixing of retro-reflectorised cautionary mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting wide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mmX75mmX6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45 cmX45cmX60cm, 60cm below ground level as per approved drawing. (as per IRC:67-2012 clause 14.60) : Stop Sign (Octagon) (90 cm height) Sl.No.18(vii)
Providing & fixing of retro-reflectorised cautionary mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting wide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mmX75mmX6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45 cmX45cmX60cm, 60cm below ground level as per approved drawing. (as per IRC:67-2012 clause 14.60) : Accident Prone Zone (80 x 60 cms) Sl.No.18(iv)
Providing & fixing of retro-reflectorised cautionary mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting wide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mmX75mmX6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45 cmX45cmX60cm, 60cm below ground level as per approved drawing. (as per IRC:67-2012 clause 14.60) : Zebra Crossing Ahead (90 cms Eqatriangle) Sl.No.18(i)
Providing, fixing of km. stone, hectometre stone & sign board etc. complete.
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/ MUL-2023-24 dated 17.02.2024) (I) Maintenance of First Year (@0% of Total Work Amount of 1 to 25)
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/ MUL-2023-24 dated 17.02.2024) (I) Maintenance of Second Year (@0.25% of Total Work Amount of 1 to 25)
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/ MUL-2023-24 dated 17.02.2024) (I) Maintenance of Third Year (@0.50% of Total Work Amount of 1 to 25)
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/ MUL-2023-24 dated 17.02.2024) (I) Maintenance of Forth Year (@0.75% of Total Work Amount of 1 to 25)
Maintenance of bituminous surface road and / or gravel road and / or WBM road including filling of pot holes and patch repair etc., restoration of rain cuts and dressing of side slopes / berms, making up of berms / shoulders, maintenance of drains, maintenance of guard rail and parapets, maintenance of road signs, speed breakers, standing tree adjacent to road wherever required, maintenance of 200m (hectometre stone) and kilometre stones, cutting of branches of trees, shrubs and trimming of grass and weeds etc., white washing of parapets including CD works, painting of guard stones and Re-Fidding of displaced guard stones etc. as per Direction of E/I for the period of Five Year from the actual completion of work. (Excluding G.S.T.) (as per performance Index Annexure-1) mentioned in GO No. 17/2024/sa-113/23-1-2024-23-1099/113/2023 dated 16.01.2024 & Enc Letter no. 3689/COPRMC/ MUL-2023-24 dated 17.02.2024) (I) Maintenance of Fifth Year (@1.00% of Total Work Amount of 1 to 25)
ABHISHEK ENTERPRISES (BID ID -4939683)