| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 LAccepted-Finance | ₹32.2 L | L1 | Accepted-Finance - |
| 2 | L2₹32.5 LRejected-Finance | ₹32.5 L | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | Subramaniyan S L2 | Lingakumar.P L1 |
|---|---|---|---|---|---|
| 1.00Construction of Panchayat Office Building at M.Shanmugapuram Village and Panchayat | |||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 84.82 | Cubic Meter | 265 ₹22,477.3 | 260 ₹22,053.2 Lowest |
| 3.00 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 19.83 | Cubic Meter | 2,050 ₹40,651.5 | 2,040 ₹40,453.2 Lowest |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 33.52 | Cubic Meter | 300 ₹10,056 | 278 ₹9,318.56 Lowest |
| 5.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 21.51 | Cubic Meter | 5,850 ₹1,25,833.5 | 5,800 ₹1,24,758 Lowest |
| 6.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
| 7.00 | Below basement | 111.07 | Squre Meter | 560 ₹62,199.2 | 545 ₹60,533.15 Lowest |
| 8.00 | Above basement | 247.67 | Squre Meter | 1,100 ₹2,72,437 | 1,093 ₹2,70,703.31 Lowest |
| 9.00Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | |||||
| 10.00 | Below basement | 19.88 | Cubic Meter | 9,580 ₹1,90,450.4 | 9,565 ₹1,90,152.2 Lowest |
Tender Value
₹33 L
EMD Value
₹33,000
Closing Date
2 Mar 2026, 3:00 pmClosed
Block Development Officer
Block Development Officer
Construction of Panchayat Office Building at M.Shanmugapuram Village and Panchayat
2026_RDTN_664918_1
Construction of Panchayat Office Building at M.Shanmugapuram Village and Panchayat
Open Tender
Civil Works
Item Rate
60 days
Block Development Office
as per tender schedule
3 documents required · 3 mandatory
₹0
₹33,000
21 Jul 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Panchayat Office Building at M.Shanmugapuram Village and Panchayat | - | - | - | - |
| 2 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 84.82 | Cubic Meter | - | - |
| 3 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 19.83 | Cubic Meter | - | - |
| 4 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 33.52 | Cubic Meter | - | - |
| 5 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 21.51 | Cubic Meter | - | - |
| 6 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | - | - | - | - |
| 7 | Below basement | 111.07 | Squre Meter | - | - |
| 8 | Above basement | 247.67 | Squre Meter | - | - |
| 9 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | - | - | - | - |
| 10 | Below basement | 19.88 | Cubic Meter | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
TechnicalBid.pdf
Tender Documents • 0.82 MB
BOQ_798520.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].