Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹92.3 LAccepted-AOC BUNDEL NAGAR SARLE NEAR JHARKHAND POLICE ACADEMY HAZARIBAG JHARKHAND INDIA | HAZARIBAGH | JHARKHAND | 825301 | 1 | Accepted-AOC Lower bid | |
| 2 | 2₹92.3 L+₹5,849.11 (0.06%)Rejected-Finance GRAM PUNAI DARU HAZARIBAGH | 2 | Rejected-Finance Higher bid | |
| 3 | 3₹92.3 L+₹5,867.48 (0.06%)Rejected-Finance GIRIDIH | 3 | Rejected-Finance Higher bid | |
| 4 | 4₹93.2 L+₹89,947.78 (0.97%)Rejected-Finance GHARWATAND P O CHAMPI PETERWAR BOKARO JHARKHAND | BOKARO | JHARKHAND | 825102 | 4 | Rejected-Finance Higher bid | |
| 5 | Rejected-Technical BANK MORE NAGAR NIGAM CAMPUS DHANBAD | - | Rejected-Technical Substantially Non Responsive |
| Sl No | Description | Qty | Unit | Sunil Kumar Yadav L3 | INDRADEV PURUSHOTTAM CONSTRUCTION PRIVATE LIMITED L2 | Priyanshu Buildcon Pvt. Ltd L4 | OMNESH CONSTRUCTION AND DEVELOPERS PVT. LTD. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge | 92.91 | M3 | 151.82 ₹14,105.44 Lowest | 151.82 ₹14,105.44 Lowest | 151.82 ₹14,105.44 Lowest | 151.82 ₹14,105.44 Lowest |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge | 203.85 | M3 | 167.33 ₹34,110.56 Lowest | 167.33 ₹34,110.56 Lowest | 167.33 ₹34,110.56 Lowest | 167.33 ₹34,110.56 Lowest |
| 3.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth,sides of foundation etc. complete. | 168.01 | M3 | 571.65 ₹96,041.77 Lowest | 571.65 ₹96,041.77 Lowest | 571.65 ₹96,041.77 Lowest | 571.65 ₹96,041.77 Lowest |
| 4.00 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick well warered, rammed , fully compacted and fire dressed with earth obtained from excavation foundation trenches/ supplied earth within a lead of 50 M and lift of 1.5M all complete as per building specification and direction of E/I
(5.1.8) | 83.61 | M3 | 55.3 ₹4,623.41 Lowest | 55.3 ₹4,623.41 Lowest | 55.3 ₹4,623.41 Lowest | 55.3 ₹4,623.41 Lowest |
| 5.00 | Filling in foundation trenches and plinth in layers... earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I | 12.69 | M3 | 128.88 ₹1,636 Lowest | 128.88 ₹1,636 Lowest | 128.88 ₹1,636 Lowest | 128.88 ₹1,636 Lowest |
| 6.00 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | 32 | Cum | 589.51 ₹18,864.32 Lowest | 589.51 ₹18,864.32 Lowest | 589.51 ₹18,864.32 Lowest | 589.51 ₹18,864.32 Lowest |
| 7.00 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per
building specification and direction of E/I. | 222.63 | Sqm | 330.34 ₹73,543.26 Lowest | 330.34 ₹73,543.26 Lowest | 330.34 ₹73,543.26 Lowest | 330.34 ₹73,543.26 Lowest |
| 8.00 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge
80 mm thick C.C. paver block of M-30 grade with approved color design and pattern | 613.47 | M3 | 890.73 ₹5,46,439.7 | 890.71 ₹5,46,427.43 | 890.73 ₹5,46,439.7 | 882.71 ₹5,41,519.63 Lowest |
| 9.00 | Dismantling old plaster and pointing in cement or lime and raking out joints to 15mm depth, watering and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 1,015.37 | M2 | 21.46 ₹21,789.88 Lowest | 21.46 ₹21,789.88 Lowest | 21.46 ₹21,789.88 Lowest | 21.46 ₹21,789.88 Lowest |
| 10.00 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 3.8 | Cum | 1,993.04 ₹7,571.56 Lowest | 1,993.04 ₹7,571.56 Lowest | 1,993.04 ₹7,571.56 Lowest | 1,993.04 ₹7,571.56 Lowest |
Tender Value
₹96.0 L
EMD Value
₹1.9 L
Closing Date
7 May 2025, 3:00 pmClosed
EE BCD BUILDING DIVISION,HAZARIBAG
Office of the Executive Engineer, Building Construction Department, Building Division, Hazaribag
Renovation Work of Upgraded Middle School Baraho , Block Tatijhariya , District - Hazaribag
2025_BCD_100727_1
BCD/EE/HAZARIBAG/08/03/2025-26
Open Tender
Civil Works
Item Rate
180 days
HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.9 L
21 Nov 2025
30 Apr 2025
8 May 2025
30 Apr 2025
7 May 2025
30 Apr 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .