Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
2 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CWE AF LEH
HQ CWE AF LEH
PROVN OF FAST ERECTABLE MODULAR STRUCTURES (FEMS) AT TRU OP LOCATION AT CHUSHOT PALAM UNDER GE (AF) LEH
2026_MES_798262_1
81265/E8
Open Tender
Civil Works
Item Rate
180 days
Leh
As per NIT
9 documents required · 9 mandatory
₹1,000
Yes
₹2.2 L
Yes
11 Nov 2026
11 Nov 2026
4 Dec 2026
11 Nov 2026
2 Dec 2026
25 Nov 2026
11 Nov 2026 - 23 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Design, Supply and Erection of Prefabricated High Altitude Modular Shelter of size 14.00 Mtr X 14.00 Mtr X 3.00 Mtr as per arch line drawing. The structural design all including of footing and foundation needs to be prepared and also to be vetted from IIT by the contractor. Certificate from IIT needs to be in conjunction with codal provns and submitted by the contractor before execution of the work. The work consists of manufacture, supply and transportation & commissioning of High Altitude modular prefab/containerized shelter of size 14.00 Mtr x 14.00 Mtr x 3.00 Mtr up to clear internal height of 2.80 Mtr. Structure frame system design with structural steel conforming to IS Code and design as per IS Codal Provns with std worst combination of load as per IS Code prevailing in various OP location at Leh. The structural frame system should support the structure. The vetted drawing should also provide details of Foundation, MS SHS Column details (min 132x132x4.8 mm), Truss details, Structural Joints and all fixing details required for execution. The work will consist of all associated works like Civil Pedestal(Exavation for foundation, removal/refilling of soil, Reinforcement/RCC work, formwork) and Freight up to site. Preliminary drawing specifications are provided in arch line drg. Final structural drawing, architectural drawing and "Good for Construction" drawing will be submitted by contractor after conclusion of contract duly vetted by IIT. The contractor shall supply & commission the items as mentioned in the specifications at the locations provided therein in accordance with the work order placed complete in all respects as directed by the Engineer-In-Charge as per the following configuration.
Design criteria: The structural shall be designed in accordance with relevant IS Provns/NBC code/ extant government guidelines suitable for various OP location. However, some of design criteria are listed as under:
(a) Seismic Co-efficient: As per Seismic Zone IV as per IS 875 Part -1 - 1987.
(b) Snow load : Min 1.0 Mtr standing on roof as per IS Codal Provns for various OP locations.
(c) Wind load : Equivalent to wind speed of 55 mtrs/sec as per IS-875 Part 3 -1988 or as per Relevant IS Provns.
(d) Roof slope : 18 Degree or as per design requirement.
(e) External Temperature Range : (-) 35 degree to (+) 25 degree.
(f) Water absorption/Penetration: Nil & adequate sealing material be provided through include Silicon Sealing Gun.
(g) Fire resistant (Walls and ceiling): Fire resistant & should not emit toxic fumes.
(h) Ease of construction : Shelters should be modular in design. Ready to ship and use shelter.
(j) Design load: As per IS 875/Relevant IS provn.
Note: All Drawings mentioned above will be vetted by IIT. | 1 | Each Job | - | - |
| 1.02 | (k) Imposed Loads – As per IS 875 Part 2 1987 for sloping roof
(l) Design of fdn : as per the structure vetted by the IIT.
(m) The design of the structure shall be carried out on 10 Ton/m² of soil bearing capacity (SBC).
(n) Transportation: The rate shall include transportation charges for a distance of approximately 20 to 30 km from Leh to the OP location site. | - | - | - | - |
| 1.03 | Design Data.
(a) Length : 14.00 M. (Outer to outer)
(b) Width : 14.00 M. (Outer to outer)
(c) Shelter Clear Height upto false ceiling :2.80 from FFL. | - | - | - | - |
| 1.04 | Material. All material required for the manufacturing of shelters will be new and will comply with relevant IS as applicable and those given succeeding para. The building shall be considered and manufactured as per IS: 875 for structural design. Structural steel : Hollow sections conforming to IS-4923 (SHS/RHS), IS-1161 (CHS) and both conforming to "Grade Yst 310" and plates as per IS-2062 (Grade E250). All tube ends shall be - welded/capped. Bolts of Grade 8.8 as per IS-1367 shall be used unless noted and specified elsewhere in the tender documents. The material should provide insulation against extreme cold weather conditions. | - | - | - | - |
| 1.05 | Workman Ship
(a) Connection: Welded connection/ CRS Nut & Bolt will be provided unless otherwise specified in the drawings. The welded connections will be conformed to IS 806-1968.
(b) Fabrication: The general provisions in section 11 of IS 800 of 1984 will apply to all types of steel being used for fabrication. Structural steel : Hollow sections conforming to IS-4923 (SHS/RHS), IS-1161 (CHS) and both conforming to "Grade Yst 310" and plates as per IS-2062 (Grade E250). All tube ends shall be wealed - welded/capped and will be of Make: TATA, Jindal, SAIL, APL Apollo, Swastik or equivalent make Structural Members shall be as per the schedule of structure. All steel members will be provided with 2 coats of red oxide zinc chromate primer & 2 coats of enamel paint as per approved colour scheme from GE (AF) Leh before supply. | - | - | - | - |
| 1.06 | Foundation shall be designed by the tenderer and quoted rate is deemed to include the same (Design Cost). All the items i.e. Excavation for foundation, removal/refilling of soil, Reinforcement/RCC work, formwork, structural steel work, bolts, base plate, connections, and erection are deemed to be included in the quoted rate for this item. Quoted rate is also deemed to include necessary vetting of Structure duly signed and stamped from any IIT of the structural drawing prepared by the approved structural design consultant of tenderer. | - | - | - | - |
| 1.07 | Shelter Steel Frame (For the Shelter Steel Frame design prepared by IIT, the details listed below shall, at a minimum, be considered.): - Welded Base Frame Structure will be fabricated with RHS Section of size 96X48X3.20mm (Outer bracing at bottom). Prefab Shelter Base shall be provided with 12 Nos SHS pedestals of minimum size 132mm x 132mm x 4.8 mm bolted to cleats – 300 mm in height. The pedestals will have bottom base plate of 300 mm x 300 mm x 20 mm with top plate 300mm x 300mm x 20mm and shall be fixed for proper support. Minimum 12 Nos vertical column shall be provided with 132mm x 132mm x 4.8 mm SHS box duly bolted with the base frame and roof frame column as per drawing and intermediate pedestals 45 Nos (minimum) as mentioned in drawing. Roof Frame Outer Structure will be fabricated with RHS Section of size as mentioned in the vetted drawing by IIT. Hipped Roof Truss will be fabricated with RHS Section as mentioned in the vetted drawing by IIT. The roof frame will be provided with 8 Nos 20 mm thick lifting hooks welded to the frame, making the prefab shelter ready to move at any point of time. The position of lifting hooks as per the vetted drawing by IIT, complete all as specified and directed by Engr-in-charge. | - | - | - | - |
| 1.08 | Wall: (a) The main and partition PUF insulated panels with colour–coated (approved color : Multani Mitti) GI metal skin. PUF Panels shall be 100mm thick for outer walls and 80 mm thick for interior/partition wall made using 0.60 mm PPGI skins on both sides and CFC Free 44 kgs bulk density (+/- 2 kgs) PUF Insulation in between. The wall PUF Panels shall be provided outer to outer of column to column and interlocked using camlocks. The PUF insulation material used in the sandwich panels shall conform to IS 12436:1988 (including amendments) and shall possess fire-retardant and self-extinguishing properties. The fire behaviour of the material shall be tested in accordance with IS 11239 (Part 8): 2024 and IS 11239 (Part 12):1988. The manufacturer's test certifcate shall be submitted for verification. There shall be no gap between wall and roof panels. All joints shall be properly sealed and finished with suitable flashing to ensure complete sealing, complete all as specified and as directed by Engr-in-Charge. | - | - | - | - |
| 1.09 | (b) All materials used for manufacturing the shelter shall be new and shall comply with the relevant Bureau of Indian Standards (BIS).
(i). Manufacturing Process:
The PUF sandwich panels shall be manufactured by a high pressure injection Process
(ii). GI Skin Specification:
The outer and inner skins of the panels shall be colour-coated GI sheets of 0.6 mm TCT (Total Coated Thickness). A 50-micron PVC guard film shall be provided on the finished surface only, to protect against scratches during handling. Galvanization shall conform to GR-120 as per IS-277.
(iii). PUF Insulated Core Properties:
• Density: 44 kg/m³ (±2 kg/m³)
• Compressive Strength (at 10% deformation): 1.15 kg/cm²
• Tensile Strength: 4.0 kg/cm²
• Bending Strength: 4.2 kg/cm²
• Adhesion Strength: 3.0 kg/cm²
(iv). Dimensional Stability (48 hours):
• At –25°C: 0.1%
• At +38°C and 90% RH: 0.1%
• At +100°C: 0.4%
• Closed Cell Content: 90–95%
• Operating Temperature Range: –35°C to +25°C
• Thermal Conductivity at 10°C: 0.018 kcal/m/hr/°C
(v). Design value: 0.020 kcal/m/hr/°C or 0.23 W/m·K | - | - | - | - |
| 1.1 | (vi). Fire Resistance:
* Horizontal extent of burn less than 100 mm as per BS 4735
* Self-extinguishing as per ASTM D1692
* Not easily ignitable as per BS 476 Part 5 (Class I) and BS 476 Part 7
(vii). Water Absorption: 0.20% by volume at 100% relative humidity
(c). All sandwich panels shall be provided with suitable tongue and groove, which shall be fixed in place during the on-site process itself. The fixing of the tongue and groove shall be such that 2.7 m long × 1.2 m wide panels can be placed properly. The tongue and groove in the panels for operation shall be provided Camlocks or with PVC caps for sealing after installation.
(d). All panels shall be manufactured in single pieces as per the approved panel layout drawing, using the above-mentioned materials and manufacturing process. The Lab Test Report must be duly issued/inspected by a NABL-accredited or Central Government–accredited laboratory and should confirm conformity of all parameters as per the specifications of the store mentioned in the bid documents (PUF Panel) | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
tenderFEMSTaru.pdf
Tender Documents • 1.50 MB
DRAWING.pdf
Additional Documents • 6.55 MB
BOQ_895507.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .