Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | ₹4.4 L | L1 | Accepted-AOC Lowest Tender Rate Quoted |
| 2 | L2₹4.4 L+₹169.49 (0.04%)Rejected-Finance | ₹4.4 L+₹169.49 (0.04%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S.Mariappan | S.VASUDEVAN |
|---|---|---|---|---|---|
| 1.00Maintenance of Road | |||||
| 1.01 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 2,160 | Sqm | 13,824 ₹16,312.32 | 13,716 ₹16,184.88 Lowest |
| 1.02 | Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 1,080 | Cum | 1,42,452 ₹1,68,093.36 Lowest | 1,42,452 ₹1,68,093.36 Lowest |
| 1.03 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat etc | 695.15 | Sqm | 23,148.5 ₹27,315.23 | 23,113.74 ₹27,274.21 Lowest |
| 1.04 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 17.44 | Cum | 1,92,830.59 ₹2,27,540.1 | 1,92,829.72 ₹2,27,539.07 Lowest |
Tender Value
₹45 L
EMD Value
₹4,500
Closing Date
31 Oct 2025, 3:00 pmClosed
BDO (BP)
BDO Office
Maintainance of Shindhuvampatti Mudithalai Road Via Narugapuram in Km 0/0 - 3/0
2025_RDTN_617510_1
A2/2772/2025
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,500
Yes
20 Nov 2025
27 Oct 2025
31 Oct 2025
27 Oct 2025
31 Oct 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737976.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
EBidShindhuvampattiRD.pdf
Tender Documents • 0.43 MB
BOQ_737976.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .