| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance | ₹6.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.9 L+₹1.1 L (15.4%)Admitted-Finance | ₹7.9 L+₹1.1 L (15.4%) | L2 | Admitted-Finance |
| 3 | L3₹9.8 L+₹3.0 L (44.2%)Admitted-Finance | ₹9.8 L+₹3.0 L (44.2%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Incomplete Document |
| 5 | Rejected-Technical | - | - | Rejected-Technical Incomplete Document |
| Sl No | Description | Qty | Unit | TRIMURTI ENTERPRISES L2 | R. P. T. Electrical L3 | shree sai enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Supervising Engineer. | ||||||
| 1.01 | PCC/STP Pole 8.5/11/13 Mtr Long. | 128 | Nos | 1,250 ₹1,60,000 | 1,500 ₹1,92,000 | 500 ₹64,000 Lowest |
| 1.02 | 10 to 400 KVA T/F. | 15 | Nos | 3,000 ₹45,000 Lowest | 3,500 ₹52,500 | 3,000 ₹45,000 Lowest |
| 1.03 | Line material such as HT/LT Cross Arms, HT/LT pin insulator, HT/LT pin, HT/LT disc insulator with fitting, stay rod, stay wire, LT AB cable (3x120) sq.mm/(3x95) sq.mm, ACSR conductor, GI wire, MS Angle, iron and MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc. | 104 | Qtl | 250 ₹26,000 Lowest | 350 ₹36,400 | 300 ₹31,200 |
| 1.04 | Distribution box single phase/three phase. | 24 | Nos | 100 ₹2,400 Lowest | 120 ₹2,880 | 200 ₹4,800 |
| 2.00 | Erection of PCC/STP pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). | 88 | Nos | 2,600 ₹2,28,800 | 2,800 ₹2,46,400 | 2,500 ₹2,20,000 Lowest |
| 3.00 | Fabrication and fixing of all HT/LT line accessories (as per UPPCL Respo). | 56 | Nos | 350 ₹19,600 | 500 ₹28,000 | 300 ₹16,800 Lowest |
| 4.00 | Mounting of 10 to 400 KVA T/F (as per UPPCL Respo). | 15 | Nos | 1,000 ₹15,000 Lowest | 1,500 ₹22,500 | 2,500 ₹37,500 |
| 5.00 | Erection of Double pole on PCC/STP pole 8.5/11/13 mtr long after digging a pitt of size 1.6 mtr. Deep in all type of soil for each pole including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). | 20 | Nos | 3,500 ₹70,000 Lowest | 3,500 ₹70,000 Lowest | 4,000 ₹80,000 |
| 6.00 | Fabrication and fixing of MS angle and MS channel, fixing all HT/LT accessories TPMO, Fuse set HT/LT pin insulators on Double pole. (as per UPPCL Respo). | 16 | Nos | 450 ₹7,200 | 400 ₹6,400 | 100 ₹1,600 Lowest |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
5 Jun 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SE, EDC-1, MEERUT
ETNo-15/EDC-1/MT/2026-27
2026_PVVNL_1155192_1
ETNo.15/EDC-1/MT/2026-27
Open Tender
Electrical Works
Lump-sum
180 days
UNDER EDD-I
ETNo-15/EDC-1/MT/2026-27
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER
₹8,000
11 Jun 2026
29 May 2026
5 Jun 2026
29 May 2026
5 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Carriage of following material from store center PVVNL to site & vice-versa of work including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Supervising Engineer. | |||||
| 1.01 | PCC/STP Pole 8.5/11/13 Mtr Long. | 128 | Nos | - | - |
| 1.02 | 10 to 400 KVA T/F. | 15 | Nos | - | - |
| 1.03 | Line material such as HT/LT Cross Arms, HT/LT pin insulator, HT/LT pin, HT/LT disc insulator with fitting, stay rod, stay wire, LT AB cable (3x120) sq.mm/(3x95) sq.mm, ACSR conductor, GI wire, MS Angle, iron and MS channel, TPMO, Fuse set, Earthing, J Hook, GI wire for guarding, MS Nuts & bolts, suspension clamp etc. | 104 | Qtl | - | - |
| 1.04 | Distribution box single phase/three phase. | 24 | Nos | - | - |
| 2 | Erection of PCC/STP pole 8.5/11/13 mtr long after digging a pit of size 1.6 mtr deep in all type of Soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). | 88 | Nos | - | - |
| 3 | Fabrication and fixing of all HT/LT line accessories (as per UPPCL Respo). | 56 | Nos | - | - |
| 4 | Mounting of 10 to 400 KVA T/F (as per UPPCL Respo). | 15 | Nos | - | - |
| 5 | Erection of Double pole on PCC/STP pole 8.5/11/13 mtr long after digging a pitt of size 1.6 mtr. Deep in all type of soil for each pole including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo). | 20 | Nos | - | - |
| 6 | Fabrication and fixing of MS angle and MS channel, fixing all HT/LT accessories TPMO, Fuse set HT/LT pin insulators on Double pole. (as per UPPCL Respo). | 16 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
TENDERFORM15.pdf
Tender Documents • 0.20 MB
BOQ_2163960.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .