Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.6 L
Closing Date
11 Mar 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex. Engineer SNDII, SMC Sgr.
Kak Sarai Srinagar
Construction of 300mm dia RCC Pipe drain including Manholes near H/O Dr. Shabir Ahmad Khan behind Dewatering Station Bilal Colony Qamarwari Srinagar
2022_HAUDD_162800_1
17/SNDII of 2021-22
Open Tender
Civil Works
Item Rate
20 days
Qamarwari
Please refer Tender documents.
5 documents required · 5 mandatory
₹350
Ex. Engineer SNDII, SMC Sgr.
Exempted
12 Mar 2022
3 Mar 2022
12 Mar 2022
4 Mar 2022
11 Mar 2022
4 Mar 2022
90 days
Amount
Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: 1. Water bound macadam road.
Earth work in excavation by Manual means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil.
Earth work in excavation by Mechanical means in foundation trenches, drains, pipes and cables (not exceeding 1.5m.in width or 10sqm. on plan) including dressing of sides and ramming of bottoms lift upto 1.5m. including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 meters. All kinds of soil.
Providing and laying dry stone soling.
Providing & laying in position Cement concrete of specified grade excluding the cost of centering & shuttering All work upto Plinth level in:- 1:5:10 (1cement: 5 coarse sand: 10 graded stone aggregate 40mm nominal size) Crushed
Providing & laying in position cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1: 3: 6 (1Cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size)
Providing & laying in position Reinforced cement concrete excluding the cost of centring & shuttering (All work upto plinth level)All work upto Plinth level in cement concrete 1: 2: 4 (1Cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete -Thermo mechanically treated Bars.
Centring& shuttering including strutting propping etc. & removal of form work for :-Walls (any thickness) incld. Attached pilasters buttresses plinth and string courses etc.
Suspended floors, roofs, landings, balconies and access plat form.
Edges of slabs above 20 cm wide.
Providing, laying and fitting Non Pressure NP3 Class (Light Duty) RCC pipes of 300mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement 2 fine sand) including fixing of rubber gaskets, testing of joints and all carriages upto the site of work (Complete Job)
Providing, laying and fitting of polycrete manhole covers including all safe carriages from Divisional Store upto site of work (Complete Job) (Manhole covers shall be supplied Departmentally).
Filling available excavated earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge.
Providing and laying of GSB/RBM over damaged portion of road during laying of pipes into trenches including cost of consolidation by using power road roller and all carriages upto site of work (complete Job).
Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work :-Stone soling for 16 Kms.
40mm N.S. stone agg. For 16 Kms
20mm N.S. stone agg. –do-
Sand for 24 Kms.
Disposal of surplus earth for 05 Kms.
High-definition geo-tagged Photographs of work to be taken before, during and after execution of work.
Prince Parvez Ahmed Bhat
M/S MEHRAJ UD DIN KHAN
MOHAMMAD YASEEN WANI
stage.html
html • 0.02 MB
finance_374678.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .