Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.1 L+₹10,934.66 (0.91%)Admitted-Finance 1220 SECTOR 31 GURGAON 122001 | GURGAON | GURGAON | HARYANA | 122001 | L2 | Admitted-Finance | |
| 3 | L3₹12.5 L+₹46,381.01 (3.86%)Admitted-Finance H NO 559 CHANDU ROAD NEAR SHIV MANDIR GGARHI HARSARU GURGAON | GURGAON | GURGAON | HARYANA | L3 | Admitted-Finance | |
| 4 | L4₹12.6 L+₹57,075.87 (4.75%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹12.8 L+₹79,534.68 (6.62%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Amrik Singh L8 | M/s Above Sky Infra Construction LLP L4 | The BABA KHUBI NATH CONSTRUCTION L6 | CHAUHAN CONSTRUCTION & DEVELOPERS L2 | THE ASHOK COOPERATIVE LABOUR AND CONSTRUCTION SOICETY LIMITED BADESRA L10 | HORIZON ENGINEERING SERVICES L11 | AGLO SOLUTIONS L7 | AJAY L3 | Pranav Enterprises L12 | Devi Ram Tanwar L5 | The Krishna Developers Labour and Construction Society Limited L1 | Vishesh Construction Co. L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Drinking Water cooler 100-Ltr.capicity 2 nos. outlet push Toti provision with 60-LPH per hour R O , complete in all respect as per satisfaction of engineer in charge. | 1 | Nos. | 40,000 ₹40,000 Lowest | 85,000 ₹85,000 | 80,000 ₹80,000 | 55,000 ₹55,000 | 85,000 ₹85,000 | 90,000 ₹90,000 | 91,300 ₹91,300 | 45,000 ₹45,000 | 48,000 ₹48,000 | 43,500 ₹43,500 | 80,000 ₹80,000 | 50,000 ₹50,000 |
| 2.00 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty) (complete in all respect) as directed by Engineer-in-charge: Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves` (690.00) SDS. | 28 | Each | 500 ₹14,000 | 600 ₹16,800 | 200 ₹5,600 Lowest | 400 ₹11,200 | 605 ₹16,940 | 640 ₹17,920 | 607 ₹16,996 | 690 ₹19,320 | 6,900 ₹1,93,200 | 590 ₹16,520 | 600 ₹16,800 | 600 ₹16,800 |
| 3.00 | Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6- 45 meters, Discharge 57-13 LPM complete in all respect as per satisfaction of engineer in charge | 1 | Each | 15,000 ₹15,000 | 7,350 ₹7,350 | 5,000 ₹5,000 Lowest | 7,900 ₹7,900 | 8,000 ₹8,000 | 8,000 ₹8,000 | 6,968 ₹6,968 | 12,500 ₹12,500 | 6,900 ₹6,900 | 10,500 ₹10,500 | 6,000 ₹6,000 | 15,000 ₹15,000 |
| 4.00 | Providing and Fixing of 1.5 Tonne 3 Star Split Air Conditioner Completer in all respect. | 2 | Each | 42,000 ₹84,000 | 45,000 ₹90,000 | 48,000 ₹96,000 | 35,000 ₹70,000 Lowest | 45,000 ₹90,000 | 50,000 ₹1,00,000 | 36,980 ₹73,960 | 38,000 ₹76,000 | 39,500 ₹79,000 | 45,000 ₹90,000 | 40,000 ₹80,000 | 40,000 ₹80,000 |
Tender Value
₹14.9 L
EMD Value
₹29,754
Closing Date
21 Sept 2026, 12:00 pmClosed
Parveen Kumar Raghav
Municipal Corporation Gurugram
Estimate for Repair and renovation of Ambedkar bhavan in Village sarhaul ward 02, Division 3A under MCG. Re-call
2026_HRY_546640_1
20260B31CB86 1E02 41AB B9D4 0C01C3E5A1F5285ULB
Open Tender
Civil Works
Works
150 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹29,754
Yes
29 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drinking Water cooler 100-Ltr.capicity 2 nos. outlet push Toti provision with 60-LPH per hour R O , complete in all respect as per satisfaction of engineer in charge. | 1 | Nos. | - | - |
| 2 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty) (complete in all respect) as directed by Engineer-in-charge: Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves` (690.00) SDS. | 28 | Each | - | - |
| 3 | Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6- 45 meters, Discharge 57-13 LPM complete in all respect as per satisfaction of engineer in charge | 1 | Each | - | - |
| 4 | Providing and Fixing of 1.5 Tonne 3 Star Split Air Conditioner Completer in all respect. | 2 | Each | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_626287.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .