| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC Lowest |
| 2 | Rejected-Technical | - | - | Rejected-Technical Highest rate Quoted |
| Sl No | Description | Qty | Unit | A SORIMUTHU L2 | C ESAKKI PANDI L1 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Litre capacity of Sump at Arasarkulam village in Vallakulam panchayat in Karungulam Union of Thoothukudi District under Mines and Minerals-2025-26-pakageno-02 | |||||
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay ,stiff block cottom, hard red earth shales, muram gravel stoney earth and earth mixed with small size boulders S.S 20 B - First depth | 29.07 | cum | 171.46 ₹4,984.25 | 165.92 ₹4,823.22 |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay ,stiff block cottom, hard red earth shales, muram gravel stoney earth and earth mixed with small size boulders S.S 20 B - Second depth | 20.99 | cum | 179 ₹3,757.28 | 173.22 ₹3,635.89 |
| 4.00 | Sand filling with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by officers. | 2.42 | cum | 1,098.36 ₹2,658.04 | 1,062.88 ₹2,572.16 |
| 5.00 | Cement concrete 1:4:8 ( One of cement, four of sand and eight aggregates) using 40mm HBGS for leveling course including the cost of mixing, curing etc., complete as directed by officers. | 2.11 | cum | 3,441.82 ₹7,262.24 | 3,330.62 ₹7,027.62 |
| 6.00Supplying and erecting stee centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS angles of size 25mm×25mm×3mm of boarding, laid oversilver oak joints of size 10cm × 6.5cm speced as 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., completed and as directed by officers. | |||||
| 7.00A) Plane surface | |||||
| 8.00 | Cover slab bottom | 20.42 | sqm | 711.75 ₹14,533.94 | 688.75 ₹14,064.38 |
| 9.00B)Curved surface | |||||
| 10.00 | Side wall alround | 120.48 | sqm | 1,067.62 ₹1.3 L | 1,033.13 ₹1.2 L |
Tender Value
₹5.5 L
EMD Value
₹5,470
Closing Date
9 Dec 2025, 3:00 pmClosed
BDO(VP) Karungulam
Karungulam panchayat union office
Construction of 30000 Litre capacity of Sump at Arasarkulam village in Vallakulam panchayat in Karungulam Union of Thoothukudi District under Mines and Minerals-2025-26-pakage no-02
2025_RDTN_628001_3
BDO(VP)KGLM Lr.No.T3/483/2025 . Date.01.12.2025-1
Open Tender
Civil Works
Karungulam union office Seydunganallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,470
21 Feb 2026
2 Dec 2025
9 Dec 2025
2 Dec 2025
9 Dec 2025
2 Dec 2025
Construction of 30000 Litre capacity of Sump at Arasarkulam village in Vallakulam panchayat in Karungulam Union of Thoothukudi District under Mines and Minerals-2025-26-pakageno-02
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay ,stiff block cottom, hard red earth shales, muram gravel stoney earth and earth mixed with small size boulders S.S 20 B - First depth
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay ,stiff block cottom, hard red earth shales, muram gravel stoney earth and earth mixed with small size boulders S.S 20 B - Second depth
Sand filling with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by officers.
Cement concrete 1:4:8 ( One of cement, four of sand and eight aggregates) using 40mm HBGS for leveling course including the cost of mixing, curing etc., complete as directed by officers.
Supplying and erecting stee centering for sides and soffits including necessary supports and shuttering to the required height for RCC items using MS angles of size 25mm×25mm×3mm of boarding, laid oversilver oak joints of size 10cm × 6.5cm speced as 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., completed and as directed by officers.
A) Plane surface
Cover slab bottom
B)Curved surface
Side wall alround
Supplying Fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc, complete as per standard specification.
Reinforcement Cement concrete 1 : 1.5 : 3 mix using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabrication charges etc
1.5m to 4.5 below G.L base slab
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_750791.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
technicalbidforsump.pdf
Additional Documents • 0.43 MB
BOQ_750791.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid