| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹16.1 L+₹1.1 L (7.33%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Documents not found as per PQC |
| Sl No | Description | Qty | Unit | AR POWER AUTOMATION L1 | exSel Corporation L2 |
|---|---|---|---|---|---|
| 1.01 | Configuration and refurbishment of existing old SCADA system. The work shall include Fallowing services for ensuring smooth & healthy SCADA operation:
A.Checking of all required events alarms dates & signals to SCADA from various bays and BCUs.
B. Modification of SCADA system of old & existing bays as per requirement.
C. Checking of defective FO cables & its healthiness.
D. Checking healthiness of all protection relays communication with SCADA | 1 | No | 1,85,100 ₹1,85,100 Lowest | 1,85,400 ₹1,85,400 |
| 1.02 | Supply of 2no's of Manage Ethernet Switches for the network device BCPU/PROT Relays communication. | 2 | No | 3,23,000 ₹6,46,000 Lowest | 3,38,000 ₹6,76,000 |
| 1.03 | Supply of LC-LC Patch Cord 5 Meter | 15 | No | 860 ₹12,900 Lowest | 860 ₹12,900 Lowest |
| 1.04 | A- Supply & installation of FO cables/patch cord/LIU and its related hardware as per site requirement –
1. Checking healthiness and rectifications of faults/issues of FO network.
2. Splicing and termination of FO cable of each kiosk.
3. Checking & modification work to complete the network .
4.communication for smooth functioning of SCADA system. | 1 | No | 1,83,500 ₹1,83,500 Lowest | 1,98,400 ₹1,98,400 |
| 1.05 | All 132/33KV BCU and Protection IED ICD/SCD/IID/CID File configuration or Extraction from the existing BCU and Relay File. For all 132kV & 33kV Feeders | 7 | No | 25,500 ₹1,78,500 Lowest | 31,000 ₹2,17,000 |
| 1.06 | SLDC Configuration/Communication of 33KV Bays, Lucknow & Modipuram Over IEC-61805-104 Protocol. | 5 | No | 15,400 ₹77,000 Lowest | 17,700 ₹88,500 |
| 1.07 | SLDC Configuration/Communication of 132KV Bays, Lucknow & Modipuram Over IEC-61805-104 Protocol | 6 | No | 25,200 ₹1,51,200 Lowest | 27,400 ₹1,64,400 |
| 1.08 | Repairing of Main & Standby Server /CPU Not Power up Need to be check hardware and Change the useless Part. | 2 | No | 14,400 ₹28,800 Lowest | 14,700 ₹29,400 |
| 1.09 | Supply of 2 No’s 27 Inch Monitor & Mouse, Keyboard for main & Standby Server. | 2 | No | 16,500 ₹33,000 Lowest | 16,800 ₹33,600 |
| 1.10Note- a) Any additional requirement of works, minor consumables,T&P, manpower etc not mentioned shall be met by contractor at his own cost. b) The contractor shall ensure safety of the manpower involved in the job by providing proper safety equipments. c) Working of all operation of equipments/ bays with SAS, aquisition of all readings and log book will treated as completed work. d) Any License/Software required for configuration & restoration of existing SCADA system shall be in scope of contractor. | |||||
Tender Value
₹16.1 L
EMD Value
₹19,500
Closing Date
4 Jul 2026, 12:00 pmClosed
SE, ETC, Varanasi
Bhikharipur, DLW, Varanasi
CONFIGURATION, RESTORATION AND INTEGRATION OF RTU CUM GATEWAY WORK WITH EXISTING SCADA
2026_UPTCL_1156837_1
E-Tender No. 11/2026-27/ETC-I/VNS
Open Tender
Electrical Works
Item Wise
30 days
132kV S/S PDDU NAGAR
Fee/EMD/PAN/GST Registration and experience for execution of work as per specification
2 documents required · 2 mandatory
₹590
SE, ETC, Varanasi
₹19,500
1 Aug 2026
3 Jun 2026
4 Jul 2026
3 Jun 2026
4 Jul 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Configuration and refurbishment of existing old SCADA system. The work shall include Fallowing services for ensuring smooth & healthy SCADA operation:
A.Checking of all required events alarms dates & signals to SCADA from various bays and BCUs.
B. Modification of SCADA system of old & existing bays as per requirement.
C. Checking of defective FO cables & its healthiness.
D. Checking healthiness of all protection relays communication with SCADA | 1 | No | - | - |
| 1.02 | Supply of 2no's of Manage Ethernet Switches for the network device BCPU/PROT Relays communication. | 2 | No | - | - |
| 1.03 | Supply of LC-LC Patch Cord 5 Meter | 15 | No | - | - |
| 1.04 | A- Supply & installation of FO cables/patch cord/LIU and its related hardware as per site requirement –
1. Checking healthiness and rectifications of faults/issues of FO network.
2. Splicing and termination of FO cable of each kiosk.
3. Checking & modification work to complete the network .
4.communication for smooth functioning of SCADA system. | 1 | No | - | - |
| 1.05 | All 132/33KV BCU and Protection IED ICD/SCD/IID/CID File configuration or Extraction from the existing BCU and Relay File. For all 132kV & 33kV Feeders | 7 | No | - | - |
| 1.06 | SLDC Configuration/Communication of 33KV Bays, Lucknow & Modipuram Over IEC-61805-104 Protocol. | 5 | No | - | - |
| 1.07 | SLDC Configuration/Communication of 132KV Bays, Lucknow & Modipuram Over IEC-61805-104 Protocol | 6 | No | - | - |
| 1.08 | Repairing of Main & Standby Server /CPU Not Power up Need to be check hardware and Change the useless Part. | 2 | No | - | - |
| 1.09 | Supply of 2 No’s 27 Inch Monitor & Mouse, Keyboard for main & Standby Server. | 2 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Documents.pdf
Tender Documents • 0.77 MB
BOQ_2167681.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .