Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC AT PO HINJILICUT GANJAM | HINJILICUT | GANJAM | ODISHA | ₹6.4 L | L1 | Accepted-AOC As per Transparent lottery system |
| 2 | L2₹6.4 LRejected-AOC | ₹6.4 L | L2 | Rejected-AOC As per Transparent lottery system |
| 3 | L2₹6.4 LRejected-AOC AT NIKIRAI POST NIKIRAI PS NIKIRAI DIST KENDRAPARA PIN 754214 | JAJAPUR | ODISHA | 754214 | ₹6.4 L | L2 | Rejected-AOC As per Transparent lottery system |
Tender Value
₹7.6 L
EMD Value
₹7,551
Closing Date
18 Dec 2025, 5:00 pmClosed
EXECUTIVE OFFICER
HINJILICUT MUNICIPALITY
Redevelopment of Crematorium Yard Near Ghodahad,Ward no-16 Under Hinjilicut Municipality
2025_ORULB_122550_23
HIN-MUN-04/2025-26
Open Tender
Civil Works - Others
60 days
HINJILICUT MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹7,551
Yes
23 Apr 2026
7 Dec 2025
19 Dec 2025
7 Dec 2025
18 Dec 2025
7 Dec 2025
Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials within initial leads and lifts as per direction of E.I.C.
Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete.
Providing Cement Concrete (1:3:6) using 40mm size hard black granite Crosser broken metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C.
Providing Brick work with Fly ash bricks of 23 Cm. x 11 Cm. x 8 Cm. size having crushing sfength not less than 75 Kg./Crn2 with dimensional tolerance + 2 % in cement mortar ( 1 : 6 ) in foundation and plinth including the cost of all materials, labour carriage, royalty etc complete.
Super Structure
16mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
Supplying , fitting & fixing of G.I. GRILLS with all fittings & labour charges for fixing at site including all taxes , freight transportation , loading & unloading charges
Wall painting 2 coats with weather seal coat of approved shade two coats to give an even shade including cost of paint including priming 1 coat with any approved primer (Water Bond ) including cost of primer
painting two coats with synthetic enamel paint over a coat pf primer of approved quality cost,conveyance,taxes of all materials,labour,T&P scaffolding,etc.
Supply and laying m40 grade heavy duty factory made hydraucally pressed and mechanically compacted free cast inter locking paver 60 mm thick approve shape preparation of sub base with 50 mm sand and levelling ,laying of interlocking paver block with sand binding and final compaction with plate vibrator finishing the surface including cutting the block with its edges and fixing kerb stone along both side of the pathway all complete as per specification and direction of Engineer-in-charge
Clearing of Grass and removal of rubbish upto a distance of 50 Mtr.s. Outside the periphery of the area
Filling good earth for levelling and filling of Undolated area as per requirement as per Direction of Incharge etc complete.(as per Local Market)
SITC of 45 watt solar street light and 6mtr tubular pole with all accessories including all labour and materials as per approved drawings,specification and direction of Engineer In Charge.etc Complete.(Payment will be made after Production of GST Voucher as per Actual )
Providing Electrical Installation & PHD Items (Payment will be made after Production of GST Voucher as per Actual )
Engagement of JCB(Excavator) for area levelling as per direction of Engineer Incharge etc complete.
Providing Photographs and Painting of transparency board at Work Site etc. complete .
Cost of Operation & Maintenance for a period of 3 years after the date of Completion ( Which will be Paid after completion of maintenance work , if Required during the O& M Period of 3 Years ) @ 3% of the Total Amount (A) .
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_569814.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_569814.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid