Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹6.2 L+₹11,311.90 (1.85%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.7 L+₹62,279.01 (10.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹7.0 L+₹89,097.11 (14.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹7.6 L+₹1.5 L (24.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹12.7 L
EMD Value
₹25,420
Closing Date
9 Feb 2026, 4:00 pmClosed
Er Imtiaz Ahmed Mir (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_301865_4
e-NIT No.153 of 2025-26 Dated 30-01-2026
Open Tender
Civil Works
Percentage
90 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹25,420
26 Feb 2026
30 Jan 2026
10 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 142.43 | Cum | 256.85 | ₹36,583.15 |
| 2 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.18 | Cum | 4,826.5 | ₹10,521.77 |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)
including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,
string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,
fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering
and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | 31.79 | Cum | 7,504.6 | ₹2,38,571.23 |
| 4 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | 21.19 | Cum | 5,673.4 | ₹1,20,219.35 |
| 5 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 17.36 | SQM | 286.35 | ₹4,971.04 |
| 6 | FORM WORK
Centering and shuttering including strutting, propping etc. and removal of form for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 26.04 | SQM | 628.95 | ₹16,377.86 |
| 7 | Dumping stone including cost of in Horizontal on level | 150 | Cum | 937.4 | ₹1,40,610 |
| 8 | Restoration of rain cuts, damage road surface patches by way of supplying & filling RBM in layers not exceeding20cm in depth rolling each layer with power load roller including carriage from source to site including unloading stacking, laying watering dressing etc. complete job (N.S.I) | 348 | Cum | 550 | ₹1,91,400 |
| 9 | Hand Packing stones in wire crates including cost of crates and stones Complete. | 195 | cum | 2,400 | ₹4,68,000 |
| 10 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 100 | cum | 153 | ₹15,300 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_979433.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .