| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 CrAccepted-Finance | ₹4.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹4.6 Cr+₹26,196 (0.06%)Rejected-Finance | ₹4.6 Cr+₹26,196 (0.06%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | S LEOFRANCISXAVIER L1 | Sri Vela Constructions L2 |
|---|---|---|---|---|---|
| 1.00Construction of high level bridge in murapalayam to alagapuram alathur across muktha river AT Moorapalayam Panchayat in Kallakurichi Block of Kallakurichi District | |||||
| 1.01 | Earthwork excavation in soft rock not requirig blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL. | 447.16 | Cum | 183.59 ₹82,094.1 Lowest | 183.59 ₹82,094.1 Lowest |
| 1.02 | Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 370.08 | Cum | 579.39 ₹2,14,420.65 Lowest | 579.39 ₹2,14,420.65 Lowest |
| 1.03 | Medium Rock & Dense Medium rock requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL)UNDER ABUTMENTS & PIERS BELOW SILL LEVEL. | 394.75 | Cum | 1,098.81 ₹4,33,755.25 Lowest | 1,098.81 ₹4,33,755.25 Lowest |
| 1.04 | Vibrated Cement Concrete of grade M 15 Nominal mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below ABUTMENT, WNGS and PIERS. | 24.67 | Cum | 5,039.42 ₹1,24,322.49 Lowest | 5,039.42 ₹1,24,322.49 Lowest |
| 1.05 | Providing and fixing Dowel Bars with 32mm steel rods of 1.5m length embedded into the rock to a depth of 0.6m by providing required depth of holes by drilling the rock in 50mm dia wherever necessary including fixing in position by grouting the embedded portion with CM 1:2 after placing the bars. | 216 | Nos | 885.96 ₹1,91,367.36 Lowest | 885.96 ₹1,91,367.36 Lowest |
| 1.06 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for footing under ABUTMENT, WNGS and PIERS | 328.22 | Cum | 9,430.86 ₹30,95,396.87 Lowest | 9,430.86 ₹30,95,396.87 Lowest |
| 1.07 | Vibrated reinforced cement concrete M 30 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS BELOW SILL LEVEL | 51.49 | Cum | 9,896.38 ₹5,09,564.61 Lowest | 9,896.38 ₹5,09,564.61 Lowest |
| 1.08 | Vibrated reinforced cement concrete M 30 grade using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL | 133.62 | Cum | 10,443.86 ₹13,95,508.57 Lowest | 10,443.86 ₹13,95,508.57 Lowest |
| 1.09 | Vibrated reinforced Cement Concrete of grade M 30 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Below SILL LEVEL | 5.65 | Cum | 10,088.84 ₹57,001.95 Lowest | 10,088.84 ₹57,001.95 Lowest |
Tender Value
₹4.8 Cr
EMD Value
₹4.8 L
Closing Date
19 Aug 2025, 3:00 pmClosed
Project Director
DRDA, Kallakurichi
Construction of High Level Bridge in Murapalayam to Alagapuram Alathur Across Muthal River in Sankarapuram Block
2025_RDTN_587307_1
B3/969/2025/004
Open Tender
Civil Works - Bridges
Item Rate
180 days
Kallakurichi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.8 L
DRDA, Kallakurichi
5 Nov 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
19 Aug 2025
1 Aug 2025
8 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .