Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
11 Nov 2022, 3:00 pmClosed
Block Development Officer (VP)
BDO Office, P.N.Palayam Panchayat Union
Salem District - Pethanaickenpalayam Block - DESILTING AGAMT POND SUPPLY AND FLOW CHANNAL REPAIR AT MURUGAN KOVIL H/O CHINNA KRISHNAPURAM in AGAMT - II - 2022-23 SLM- PNP-08/2022-23
2022_RDTN_257493_35
Roc.No.2344/2022/T1
Open Tender
Civil Works
Item Wise
90 days
BDO Office, P.N.Palayam Panchayat Union
As per tender Document
3 documents required · 3 mandatory
₹0
₹5,000
16 Nov 2022
25 Oct 2022
11 Nov 2022
25 Oct 2022
11 Nov 2022
25 Oct 2022
Amount
1.DESILTING AGAMT POND SUPPLY AND FLOW CHANNAL REPAIR AT MURUGAN KOVIL H/O CHINNA KRISHNAPURAM
Clearing juliflora jungle with uprooting including removal of stumps, roots and disposing of the same as directed by the Engineer- in- charge of work and as per the technical specification.
Earth work in all soils expected hard rock requiring blastering and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tiooers for formation of bund in layers of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (optimum moisture Content ) and compaction of each layers to 95% proctor density through deployment of appropriate compaction equipment (+8-10T power roller / Vibratory power Roller/ Short width + - 0.90m with drum ) power roller / fuel operated or elect operated place compactor ensuring compaction of designed bund section including side slope" complete as per Specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
EPS CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .