Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹316.9 CrAdmitted-Finance 201 202 LALA 1 LANDMARK MG ROAD HYDERABAD HYDERABAD | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Godrej and Boyce Mfg Co Ltd L1 |
|---|---|---|---|---|
| 1.00LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: PROJECT MANAGEMENT, PLANNING & SCHEDULING, COST ENGINEERING, RESIDUAL ENGINEERING, DETAILED ENGINEERING, PROCUREMENT SERVICES, MATERIAL CONTROL & WARE HOUSE MANAGEMENT, CONSTRUCTION MANAGEMENT & QUALITY ASSURANCE, INSPECTION & EXPEDITING, TRANSPORTATION OF MATERIAL/ EQUIPMENTS INCLUDING OVER DIMENSIONAL CONSIGNMENTS, ROUTE SURVEY UPTO WORK SITE, COMMISSIONING AND SUBSTATION CHARGING, START UP, TRAINING, RISK ANALYSIS, STATUTORY APPROVALS, ETC. AS PER THE TENDER SPECIFICATION OF 220 KV SWITCHYARD AND GAS INSULATED SUBSTATION PACKAGE, COMPLETE IN ALL RESPECT AS PER BIDDING DOCUMENT AND DIRECTION OF ENGINEER-IN-CHARGE . BIDDER TO CONSIDER ANY OTHER MATERIAL/ITEM ALSO REQUIRED FOR COMPLETION OF THE PLANT WORKS BUT NOT SPECIFICALLY IDENTIFIED AND COVERED ABOVE FOR COMPLETION OF LSTK PACKAGE WORKS THE QUOTED PRICE SHALL ALSO INCLUDE THE INSURANCE, ALL APPLICABLE TAXES, DUTIES, ROYALTY AND LEVIES AS PER BIDDING DOCUMENTS | ||||
| 1.01 | Total Lumpsump Price in INR | 1 | LUMPSUM | 3,16,94,11,866.85 ₹3,16,94,11,866.85 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 Cr
Closing Date
18 Sept 2025, 12:00 pmClosed
Mr. Jaydip Purkayastha, GM (SCM)
EIL, GURUGRAM
220 KV GAS INSULATED SUBSTATION PACKAGE FOR PDH-PP PLANT WITH ETHANE AND PROPANE STORAGE AND HANDLING FACILITIES AT DAHEJ, GUJARAT OF M/s PETRONET LNG LIMITED (PLL)
2025_EIL_863682_1
JP/B862-000-EB-T-0020/1021
Open Tender
Miscellaneous Works
Works
570 days
AS PER TENDER DOCUMENT
AS PER TENDER DOCUMENT
14 documents required · 14 mandatory
₹0
₹1.2 Cr
Yes
AS PER TENDER DOCUMENT
17 Oct 2025
9 Jun 2025
19 Sept 2025
9 Jun 2025
18 Sept 2025
6 Aug 2025
9 Jun 2025 - 30 Jun 2025
23 Jun 2025
Amount
LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: PROJECT MANAGEMENT, PLANNING & SCHEDULING, COST ENGINEERING, RESIDUAL ENGINEERING, DETAILED ENGINEERING, PROCUREMENT SERVICES, MATERIAL CONTROL & WARE HOUSE MANAGEMENT, CONSTRUCTION MANAGEMENT & QUALITY ASSURANCE, INSPECTION & EXPEDITING, TRANSPORTATION OF MATERIAL/ EQUIPMENTS INCLUDING OVER DIMENSIONAL CONSIGNMENTS, ROUTE SURVEY UPTO WORK SITE, COMMISSIONING AND SUBSTATION CHARGING, START UP, TRAINING, RISK ANALYSIS, STATUTORY APPROVALS, ETC. AS PER THE TENDER SPECIFICATION OF 220 KV SWITCHYARD AND GAS INSULATED SUBSTATION PACKAGE, COMPLETE IN ALL RESPECT AS PER BIDDING DOCUMENT AND DIRECTION OF ENGINEER-IN-CHARGE . BIDDER TO CONSIDER ANY OTHER MATERIAL/ITEM ALSO REQUIRED FOR COMPLETION OF THE PLANT WORKS BUT NOT SPECIFICALLY IDENTIFIED AND COVERED ABOVE FOR COMPLETION OF LSTK PACKAGE WORKS THE QUOTED PRICE SHALL ALSO INCLUDE THE INSURANCE, ALL APPLICABLE TAXES, DUTIES, ROYALTY AND LEVIES AS PER BIDDING DOCUMENTS
Total Lumpsump Price in INR
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
172669151.pdf
Tender Document • 0.39 MB
172669153.html
Tender Document • 0.09 MB
176508046.pdf
Tender Document • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .