| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.5 L+₹1.2 L (8.12%)Rejected-Finance ALKAPURI ETAWAH | ETAWAH | UTTAR PRADESH | 206001 | L2 | Rejected-Finance NA | |
| 3 | L3₹15.5 L+₹1.2 L (8.28%)Rejected-Finance | L3 | Rejected-Finance NA | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹38,500
Closing Date
18 Mar 2021, 3:00 pmClosed
EE KCD BANDA
EE KCD BANDA
Girwa ke km 5.180 6.400 aur khanpur minor ke km 3.030 par puliya punarnirman aur minor ke km 3.960 km 2.210par puliya marammat karya Lot-01
2021_UPIDC_563207_1
03/ken/nivida/2020-21 dt 01.03.2021
Open Tender
Civil Works
Item Rate
75 days
BANDA
Girwa ke km 5.180 6.400 aur khanpur minor ke km 3.030 par puliya punarnirman aur minor ke km 3.960 km 2.210par puliya marammat karya Lot-01
2 documents required · 2 mandatory
₹354
₹38,500
Yes
13 Dec 2021
10 Mar 2021
18 Mar 2021
10 Mar 2021
18 Mar 2021
10 Mar 2021
Amount
Dismentling of Brick or stone masonary in lime or cement mortar.
Dismentling of R.C.C
E/w in MKRK mixed soil in foundation with disposal with in 30m lead
Sand filling in foundation i/c all cost of material labour T&P etc.
C.C. 1:3:6 with 20-40mm gauge stone ballast i/c all cost of material labour T&P etc.
C.C. 1:2:4 with 20-40mm gauge stone ballast i/c all cost of material labour T&P etc.
R.C.R. Stone masonary with 1:4 cement sand mortar i/c all cost of material labour T&P etc. complete
Brick masonary with 1:4 cement sand mortar including all cost of material labour T&P etc
R.C.C. 1:1 1/2:3 with 10-20mm gauge stone ballast i/c all cost of material labour T&P etc.
Centring and shuttering for RCC slab,lintels and simple beam including all materials, labour and T & P etc complete
S/L reinforcement as for steel with cutting bending & binding in position
Struck raised cement pointing with 1:2 cement sand mortor with i/c all cost of material labour T&P etc complete
Struck deep cement pointing with 1:2 cement sand mortar i ncluding all cost of material labour T&P etc complete
E/W in MKRK mixed soil in correcting section of canal i/c lead upto 595m and lift upto 1.5m with manual compaction and dressing etc complete.
S/F sign board during construction of work
Finishing walls with acrylic shooth paint of required shade of new work (Two or more coat applied @ 1.67 Lts/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg./10sqm.)
Dry stone boulder pitching I/C all cost of material labour T&P etc complete
M/S SUNIL KUMAR
m/s prabhu con. & sup.
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .