Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.7 L+₹39.51 (0.01%)Admitted-Fee/PreQual/Technical/Finance | ₹2.7 L+₹39.51 (0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | J.Selvinraj L2 | S.PRAWIN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Mini GLR at Mettur Burial Ground in Kadayam Perumpathu Panchayat Kadayam Panchayat Union Under Panchayat Union General Fund - 2026 - 2027 | |||||
| 2.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete. | 8.96 | cum | 264 ₹2,365.44 | 263 ₹2,356.48 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 4.79 | cum | 5,328 ₹25,521.12 Lowest | 5,328 ₹25,521.12 Lowest |
| 4.00 | Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete. | 5.72 | cum | 46 ₹263.12 | 45 ₹257.4 Lowest |
| 5.00 | Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete. | 0.82 | cum | 1,631 ₹1,337.42 | 1,630 ₹1,336.6 Lowest |
| 6.00 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 12.55 | cum | 5,695 ₹71,472.25 Lowest | 5,695 ₹71,472.25 Lowest |
| 7.00 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete. | 7.95 | cum | 6,090 ₹48,415.5 Lowest | 6,090 ₹48,415.5 Lowest |
| 8.00 | Centering charges for RCC works including all cost and conveyance all materials to site etc., complete. | 9.52 | sqm | 1,095 ₹10,424.4 | 1,094 ₹10,414.88 Lowest |
| 9.00 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 2.78 | Qtl | 9,186 ₹25,537.08 | 9,185 ₹25,534.3 Lowest |
| 10.00 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering. | 1.5 | cum | 8,942 ₹13,413 | 8,940 ₹13,410 Lowest |
Tender Value
₹3.2 L
EMD Value
₹3,230
Closing Date
17 Sept 2026, 3:00 pmClosed
Block Development officer,B.Pt
BDO (B.Pt), Kadayam.
Construction of Mini GLR at Mettur Burial ground in Kadayam Perumpathu Panchayat.
2026_RDTN_698883_2
BDKDM/316/2026-A2 Date 25-08-2026
Open Tender
Civil Works
Item Rate
Kadayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,230
18 Sept 2026
28 Aug 2026
18 Sept 2026
28 Aug 2026
17 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Mini GLR at Mettur Burial Ground in Kadayam Perumpathu Panchayat Kadayam Panchayat Union Under Panchayat Union General Fund - 2026 - 2027 | - | - | - | - |
| 2 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete. | 8.96 | cum | 263.78 | ₹2,363.47 |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 4.79 | cum | 5,329.32 | ₹25,527.44 |
| 4 | Filling with Excavated earth including cost and conveyance and all labour charges such as watering and ramming etc., complete. | 5.72 | cum | 45.85 | ₹262.26 |
| 5 | Supplying and filling with sand including cost and conveyance and all labour charges such as watering and ramming etc., complete. | 0.82 | cum | 1,630.84 | ₹1,337.29 |
| 6 | Random Rubble Measonry in CM 1:5 mix using required bond stone with simulataneous pointing including all cost and conveyance and all labour charges etc., complete. | 12.55 | cum | 5,695.88 | ₹71,483.29 |
| 7 | Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete. | 7.95 | cum | 6,090.48 | ₹48,419.32 |
| 8 | Centering charges for RCC works including all cost and conveyance all materials to site etc., complete. | 9.52 | sqm | 1,095 | ₹10,424.4 |
| 9 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 2.78 | Qtl | 9,186.59 | ₹25,538.72 |
| 10 | RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete excluding cost of steel without centering. | 1.5 | cum | 8,942.13 | ₹13,413.2 |
stage.html
html • 0.02 MB
finance_840112.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
BOQ_840112.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .