Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹8.0 Cr
EMD Value
₹1.2 Cr
Closing Date
6 Mar 2024, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
P Hemantharaj
Improvement to Sompura-Sidnekoppa M.D.R from Km 0.00 to Km 6.00 in Yalburga constituency, Kuknur Taluk, Koppal District (Working chainage from Km 0.34 to Km 5.44)
PWD/2023-24/RD/WORK_INDENT8868
PWD/2023-24/RD/WORK_INDENT8868
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Koppala
11 documents required · 11 mandatory
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
As per Clause 3.2(b) : To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) satisfactorily completed (at least 50% of the contract value) as prime contractor, at least one similar work such as Asphalt Road Work of value not less than Rs. 401.52 Lakhs.
As per Clause 3.2(c) :To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (c) executed in any one year, the following minimum quantities of work :a) Earthwork, Embankment,Sugrade &Earthen shoulders: 7945.00 Cum. b)GSB: 4972.00 Cumc)WMM/ WBM: 5647.00 Cum.d)BM/ SDBC: 2480.00Cum. e)RCC/ PCC:242.00Cum.
PWD Registration copy
As per Clause 3.3(a)&(b) : To qualify for award of this contract, Each Tenderer should demonstrate the availability of the machineries/equipment as mentioned below1)Pug mill 1 No.Own/Hire/ Lease 2) Mechanical concrete mixer - 2 Nos. i.e.,1 No. Own, 1 No.Own/Lease/Hire 3) Tippers - 4 Nos : 2 Own, 2 Own/Hire/ Lease 4) Excavators - 2 Nos :1Own, 1 Own/Hire/Lease 5) Water Tankers : 2 Nos - 1 Own, 1 Own/Hire/Lease
As per Clause 3.2(a): To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (a) achieved in at least two financial years a minimum financial turn over (in all classes of civil engineering construction works only) of Rs.1606.05 Lakhs. (usually not less than two times the estimated annual payments under this contract)
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
As per Clause 3.3(c) : To qualify for award of this contract, Each Tenderer should further demonstrate: Liquid assets and /or availability of credit facilities of not less than Rs. 267.70 Lakhs. (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)
Principal Place of Business
Litigation in which the Tenderer is involved.
List of existing commitments and ongoing works.
List of works for which tenders already submitted.
₹5,000
₹1.2 Cr
22 Feb 2024
22 Feb 2024
7 Mar 2024
28 Feb 2024
26 Feb 2024
Improvement to Sompura-Sidnekoppa M.D.R from Km 0.00 to Km 6.00 in Yalburga constituency, Kuknur Taluk, Koppal District (Working chainage from Km 0.34 to Km 5.44) (Road work))
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Construction of unlined surface drains of average cross sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3...
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- including cost of a...
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacte...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and com...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanica...
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. ---- including cost of all materials, labour, HOM, I
Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported t...
Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight ...
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vi...
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick ...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vi...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal ...
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- including cost of all materials,...
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc ---- including cost of all materials, labour, HOM, I
Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- For 200 m stone (precast) ---- including cost of all ...
Construction of Hume Pipe Culvert 3 Nos
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Additionalities for Formwork, Centering & Scaffolding- For Foundation, Culverts (Head walls) ---- including cost of all materials, labour, HOM, I
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Construction of RCC Drain work
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Additionalities for Formwork, Centering & Scaffolding For Cement Concrete Drain Walls ---- including cost of all materials, labour, HOM, I
Maintenance of Road Work for 3rd Year
Road Maintenance for 3rd yearfor road with BM+SDBC as wearing coat: Maintenanceof Road for 3rd yearby Clearing & Uprooting Vegetation on either sides of road, Maintenance of surface drains by cleaning...
Maintenance of Road Work for 4th Year
Road Maintenance for 4th yearfor road with BM+SDBC as wearing coat: Maintenanceof Road for 4th yearby Clearing & Uprooting Vegetation on either sides of road, Maintenance of surface drains by cleaning...
Maintenance of Road Work for 5th year
Road Maintenance for 5th yearfor road with BM+SDBC as wearing coat: Maintenanceof Road for 5th yearby Clearing & Uprooting Vegetation on either sides of road, Maintenance of surface drains by cleaning...
6th Year Renewal Work
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification. ---- i...
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. ---- inc...
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor ---- including cost of all materials, labour, HOM, I
Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment ---- including cost of all materials, labour, HOM,...
Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical s...
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back ...
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- includ...
Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight ...
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC...
Estimate for Electrical Pole Shifting
RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ---- including cost of all materials, labour, HOM, I
PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I
PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I
11 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I
HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I
LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I
11 kV, 45 kN Polymeric Insulator . ---- including cost of all materials, labour, HOM, I
11 kV, 5 kN Composite/Polymeric Pin Insulator. ---- including cost of all materials, labour, HOM, I
Guy Set ---- including cost of all materials, labour, HOM, I
Rabbit ACSR conductor ---- including cost of all materials, labour, HOM, I
Loading & Unloading of 9mt pole. ---- including cost of all materials, labour, HOM, I
Loading & Unloading of 8mt pole. ---- including cost of all materials, labour, HOM, I
R&R of 9mt pole ---- including cost of all materials, labour, HOM, I
R&R of X-Arm ---- including cost of all materials, labour, HOM, I
R&R of HTST ---- including cost of all materials, labour, HOM, I
R&R of Rabbit ---- including cost of all materials, labour, HOM, I
RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ---- including cost of all materials, labour, HOM, I
PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I
PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I
11 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I
HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I
LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ---- including cost of all materials, labour, HOM, I
Guy Set ---- including cost of all materials, labour, HOM, I
Loading & Unloading of 9mt pole. ---- including cost of all materials, labour, HOM, I
Loading & Unloading of 8mt pole. ---- including cost of all materials, labour, HOM, I
R&R of 9mt pole ---- including cost of all materials, labour, HOM, I
R&R of X-Arm ---- including cost of all materials, labour, HOM, I
R&R of HTST ---- including cost of all materials, labour, HOM, I
R&R of Rabbit ---- including cost of all materials, labour, HOM, I
Supplying of Vehicle to PWD Sub-Division Yelburga
Mahindra Bolero Neo N10 (O) BS-VI ---- including cost of all materials, labour, HOM, I
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Typical Cross Section-0-34 to 2-24.pdf
Others - Cross sections • 0.51 MB
Typical Cross Section-2-24 to 5-44.pdf
Others - Cross sections • 0.45 MB
WI No 8868(KW-4) Yel.docx
Tender Document • 0.95 MB
Strip Chart-Sompura-Sidnekoppa.pdf
Others - bar chart • 0.12 MB
(2) KBS-Section-16 Electrification-External.doc
Others - Specifications • 0.52 MB
Road concrete pavement specification.doc
Others - Speicifications • 2.57 MB
Road specification.doc
Others - Specifications • 2.70 MB
Bridges specifications.doc
Others - Specifications • 5.14 MB
Star rates.docx
Others - Star rates • 6.58 MB
Formats (KW-4).xlsx
Others - Formats • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .