Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC | ₹11.3 L | L1 | Accepted-AOC Agency Quoted less than departments justify rates. |
| 2 | L2₹11.9 L+₹54,435.84 (4.81%)Rejected-Finance 86 MOULI JAGRAN COMPLEX CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹11.9 L+₹54,435.84 (4.81%) | L2 | Rejected-Finance Agency Quoted less than departments justify rates but on Higher Side |
| 3 | L3₹12.5 L+₹1.2 L (10.9%)Rejected-Finance M S YADAV CONSTRUCTION SCF NO 459 1ST FLOOR MOTOR MARKET MANIMAJRA CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹12.5 L+₹1.2 L (10.9%) | L3 | Rejected-Finance Agency Quoted less than departments justify rates but on Higher Side |
Tender Value
₹12.9 L
EMD Value
₹25,740
Closing Date
17 Jun 2026, 12:00 pmClosed
Exe. Engineer Roads Division No 3 MC Chandigarh
Exe. Engineer Roads Division No 3 MC Chandigarh
CONSTRUCTION OF MULTIPLAY COURTYARD FOR VARIOUS GAMES INSIDE COMMUNITY CENTER, SECTOR 21, CHANDIGARH
2026_MCC_92915_2
MCC/2026/ROADS-III/06-01
Open Tender
Civil Works - Others
Percentage
90 days
Work
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹25,740
21 Aug 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :
30 mm thick | 1 | Sqm | - | - |
| 2 | Mirror polishing on marble work/Granite work/stone work where ever required to give high gloss finish complete. | 1 | Sqm | - | - |
| 3 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.
Made of G.I. wire of dia. 4 mm, | - | Sqm | - | - |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1 | Kg | - | - |
| 5 | Making pits of size 2' x2'x3' by manual means removing pavers 80 mm thick, 3" lean concrete and 2'6" deep earthwork including carriage of the demolished materail by mechanical/manual means upto a lead of 2 kms complete in all respect as per the satisfaction of EIC. | - | Nos | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources). | - | Cum | - | - |
| 7 | Providing and fixing 1.5" to 3" wide black stone 20mm thick strips after cutting kota stone flooring in cutting portion for marking of courtyard for particular game over 20mm thick cement mortar 1:4 and grouting of joints with pigment matched in cement mortar complete in all respect to the entire satisfaction of Engineer-in-Charge. | - | Mtr | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.65 MB
BOQ_114102.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .