Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | ₹10.7 L | L1 | Accepted-AOC Successful |
| 2 | L2₹12.1 LRejected-AOC AT BIRADARPADA W NO 04 P O TALCHER TOWN DIST ANGUL | ANGUL | ODISHA | ₹12.1 L | L2 | Rejected-AOC Unsuccessful |
Tender Value
₹11.5 L
EMD Value
₹11,490
Closing Date
10 Jul 2026, 5:00 pmClosed
Executive Officer, Talacher Municipality
At - Municipal Office, P.O. Talacher Toiwn, Dist.Anugola
Const. of CC drain from Mangala Mandir towards Dukha Sethi house in W.No.12
2026_ORULB_133707_1
TCRM-7/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Talacher Municipality Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹11,490
Yes
17 Aug 2026
30 Jun 2026
13 Jul 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kinds of soil with lead & lift etc., including leveling and dressing of bed etc., complete | - | cum | 299.53 | - |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | - | cum | 725.95 | - |
| 3 | P.C.C (1:3:6) using 4cm size b.h.g (HB) metal including cost, conveyance and royalty of all materials, cost of all labour, T&P, etc., complete | - | cum | 5,989.99 | - |
| 4 | RCC M-20 cement concrete with using 12mm to 20 mm down graded chips with all cost labour material complete including cost of all machinary such as conccrete mixture,vibrator etc | 1 | cum | 6,039.72 | ₹6,033.68 |
| 5 | Labor for M.S. reinforcement for RCC work including cutting, bending, binding with all cost of labour, T&P, cost of binding wire, etc. complete. | 1 | qntl | 8,530.25 | ₹8,521.72 |
| 6 | Rigid smooth centering & shuttering for CC or R.C.C. work including false work & dismentalling then after casting with all cost etc. complete. | - | sqm | 248.67 | - |
| 7 | Carrage of earth including all cost etc. complete | - | cum | 276.01 | - |
| 8 | Cost towards Transperency board, photograph, & other unforseen items | 1 | No. | 14,849.46 | ₹14,849.46 |
| 9 | Add towards GST 18% | 1 | No. | 1,75,278.38 | ₹1,75,278.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_598865.xls
BOQ • 0.38 MB
DTCN.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].