Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹15.6 L
EMD Value
₹15,554
Closing Date
3 Oct 2026, 6:00 pmClosed
ee pw north z p ahilyanagar
ee pw north z p ahilyanagar
Strengthening and Black Toping From NH 8 Nagar Manmad Road to Waghacha Akhada Jadhav wasti to Aradgaon Road Waghacha Akhada Jadhav Wasti to Aradgaon Road VR 68 Km 3/00 to 6/00 Tal RAHURl Dist AHlLYANAGER
2026_AHMED_1341995_1
ZP/PWND/30543068/17/2026-27
Open Tender
Civil Works
Percentage
180 days
ee pw north z p ahilyanagar
AS PER NIT
2 documents required · 2 mandatory
₹590
₹15,554
5 Oct 2026
30 Sept 2026
5 Oct 2026
30 Sept 2026
3 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 822 | Sqm | 7 | ₹5,754 |
| 2 | Picking the road surface including sectioning etc. complete (BT surface.) | 840 | Sqm | 44 | ₹36,960 |
| 3 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 115.6 | Cum | 119 | ₹13,756.4 |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) | 11.7 | Cum | 207 | ₹2,421.9 |
| 5 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)80 mm Metal, By breaking Boulders (Hand broken). | 46.2 | Cum | 1,030.77 | ₹47,621.57 |
| 6 | Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements) a)40 mm Metal, By breaking Boulders (Hand broken). | 105 | Cum | 1,080.77 | ₹1,13,480.85 |
| 7 | Supplying soft murum at the road site, including conveying and stacking complete. | 31.5 | Cum | 684.22 | ₹21,552.93 |
| 8 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 142.38 | Cum | 687.22 | ₹97,846.38 |
| 9 | Spreading 80/40 mm metal for road work including sectionong etc complete | 151.2 | Cum | 85 | ₹12,852 |
| 10 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 173.88 | Cum | 79 | ₹13,736.52 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_2293993.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .