Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.6 LAccepted-AOC | L1 | Accepted-AOC AWARDED | |
| 2 | L2₹42.4 L+₹37,547.53 (0.89%)Rejected-Finance | L2 | Rejected-Finance HIGHER | |
| 3 | L3₹44.0 L+₹1.9 L (4.55%)Rejected-Finance NEAR BDO OFFICE BUDANA ROAD NARNAUND 125039 | NARNAUND | HISAR | HARYANA | 125039 | L3 | Rejected-Finance HIGHEST | |
| 4 | Rejected-Technical NEAR RAVIDASS MANDIR TALHERI GUJRAN AMBALA 133201 | AMBALA | AMBALA | HARYANA | 133201 | - | Rejected-Technical DUE TO INCOMPLETE DOCUMENTS |
Tender Value
₹46.6 L
EMD Value
₹93,500
Closing Date
22 May 2025, 1:00 pmClosed
AMANA Kumar
Executive Engineer Kurukshetra
SALPANI KHURD CONST OF SUB HEALTH CENTER SHC VILLAGE SALPANI KHURD ISMAILABAD KKR
2025_HRY_445832_1
202533A0D264 4A55 4CAB B4B5 197EFF82D827694DEV
Open Tender
Civil Works
Works
380 days
SALPANI KHURD
SALPANI KHURD CONST OF SUB HEALTH CENTER SHC
VILLAGE SALPANI KHURD ISMAILABAD KKR
2 documents required · 2 mandatory
₹5,000
₹93,500
Yes
18 Jun 2025
9 May 2025
23 May 2025
9 May 2025
22 May 2025
9 May 2025
Amount
S/E of 1.5 ton split AC (Voltas/ Blue star/ Lloyed) including cost of M.S. stand , Stablizer,and 9 ft copper pipe and all other patty material required to complete the job in all respect.
s/e of 45 watt LED street light fitting (Philips Bajjaj etc )make including making necessary connections
Supply of cable complete with necessary connections 16 sqmm 4 core armaured cable Complete.
Supply of 20 Watt LED Tube Light Fitting (Philips/ Bajaj/Wipro/Surya/Hevells/Helonix) Complete all respect.
S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of Split A.C. 2.0 Ton 5 star (Lloyed/ Voltas/ Blue Star/Diakin) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of PVC drain pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect.
S/E of copper pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect.
Bidder Name
Amount
THE KISAN CO-OPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED (GSTN-NA) BID ID -1265774
The Shri Ganesh Cooperative Labour and Construction Society Ltd. Uchana (GSTN-NA) BID ID -1264942
THE NARNAUND ADARSH CO-OP L&C SOCIETY LTD NARNAUND (GSTN-NA) BID ID -1265961
THE KISAN CO-OPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED (BID ID -1265774)
THE NARNAUND ADARSH CO-OP L&C SOCIETY LTD NARNAUND (BID ID -1265961)
THE KISAN CO-OPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED (BID ID -1265774)
THE NARNAUND ADARSH CO-OP L&C SOCIETY LTD NARNAUND (BID ID -1265961)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .