Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.7 LAccepted-Finance 270 17TH WARD KARUMALAIKOODAL METTUR DAM 2 | METTUR DAM | 1 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹3,700
Closing Date
2 Feb 2023, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM DM Plant Overhauling of various types of Pumps in DMP stage I and II and CST of Unit I to IV
2023_EB_282435_1
CE / MTPS-I / SE / M-I / BM / OT.306 / 2022-23
Open Tender
Power/Energy Projects/Products
Works
70 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹3,700
Yes
6 Feb 2023
19 Jan 2023
3 Feb 2023
19 Jan 2023
2 Feb 2023
19 Jan 2023
Amount
Overhauling of Degassed Water Transfer Pumps / DM Water Transfer Pumps / Effluent Water Transfer Pumps / Stator Water Transfer Pumps / Boiler Fill Pumps / Hot Well Make up Pumps / Acid and alkali transfer pumps. Charges for de-coupling the pump & its motor after disconnecting the Electric supply, de-positioning the Motor, Remove the Rotary assembly from casing and refitting the same after completion of overhauling works.
Charges for dismantling the pump spares & renewal of worn-out parts by new one or reconditioning the spares if necessary and reassembling the same and other related work if any.
Charges for removing the existing wear rings from impeller and refixing new rings, machining to required dimension, drilling & tapping works for crub screw arrangement.
Charges for pump and motor alignment work
Labour charges for complete overhauling including dismantling, cleaning of Effluent pump parts, replacing the worn out spares by new one (if necessary) and re - assembling the same after completion of overhauling work & allied works if any.
Charges for Trueness checking & removing run out for the Head & Impeller Shaft of Effluent Pump.
Charges for alignment for the base plate of the vertical Effluent pump with bed frame Bed bolts in full tight condition and coupling the motor with the pump & related works.
Supply of bearings for Hot well make up pumps & Boiler fill pumps
Supply of bearings for Effluent pump
T & Ps consumables
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .