Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.4 LAdmitted-Finance | -22.56% | ₹16.4 L | L1 | Admitted-Finance |
| 2 | L2₹17.4 LAdmitted-Finance UTTAR PRADESH | GHAZIABAD | UTTAR PRADESH | 201011 | -17.69% | ₹17.4 L | L2 | Admitted-Finance |
| 3 | L3₹19.3 LAdmitted-Finance N A | NA | NA | 121004 | -9.00% | ₹19.3 L | L3 | Admitted-Finance |
| 4 | L4₹19.7 LAdmitted-Finance LUCKNOW | UTTAR PRADESH | 226001 | -7.10% | ₹19.7 L | L4 | Admitted-Finance |
| 5 | L5₹20.8 LAdmitted-Finance | -2.00% | ₹20.8 L | L5 | Admitted-Finance |
Tender Value
₹21.2 L
EMD Value
₹42,400
Closing Date
29 May 2026, 5:00 pmClosed
AMA ZP SAMBHAL
OFFICE ZP SAMBHAL
5- GRAM BEHTA JAYSINGH ME ZILA PANCHAYAT KARYALYA BHAWAN PARISAR KE BAHAR NALA/PULIYA AUVAM NALA NIRMARN KARYA
2026_UPPRD_1147589_5
158/ZPS/NIANU/PRV/2026-27 dt 11/05/2026
Open Tender
Civil Works
Percentage
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,596
ZILA NIDHI ZP SAMBHAL
₹42,400
9 Jun 2026
12 May 2026
30 May 2026
12 May 2026
29 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance work all l/m complete. | 176 | sqm | 5.37 | ₹945.12 |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side.and bottom and backfilling in trenches with excavated suitable material. | 80.4 | M3 | 281.3 | ₹22,616.52 |
| 3 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (1:3:6) | 28.05 | M3 | 6,931.24 | ₹1,94,421.28 |
| 4 | Providing concrete (1:1.5:3) for reinforced concrete in sub structure complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M-25 | 141.06 | M3 | 8,370.54 | ₹11,80,748.37 |
| 5 | Supplying, fitting, and placing M.S bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. | 77.51 | Qtl. | 8,118.93 | ₹6,29,298.26 |
| 6 | Earth work in embankement lead uo to 5 km all l/m complete. | 288 | M3 | 293.5 | ₹84,528 |
| 7 | Supply & Fixing sign board all l/m complete. | 1 | Job | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.81 MB
BOQ_2147046.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].