Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-Finance | ₹3.7 Cr | L1 | Accepted-Finance More then the Estimate Cost |
Tender Value
₹3.6 Cr
EMD Value
₹3.6 L
Closing Date
7 Mar 2024, 3:00 pmClosed
The Commissioner, Tambaram Corporation
New Colony 3rd Main Road, Chrompet,
TCMC - Removal of Legacy Waste Dumped in the Periya Eri Through BioMining Process Phase 2 Tambaram City Municipal Corporation
2023_MAWS_402096_1
1099/2023/E1
Open Tender
Solid Waste Management
Item Rate
365 days
Pallavaram Periya Eri
Please refer Tender documents.
7 documents required · 7 mandatory
₹10,000
Yes
₹3.6 L
Tambaram City Municipal Corporation Zone II Office
15 Jun 2024
22 Dec 2023
7 Mar 2024
22 Dec 2023
7 Mar 2024
22 Dec 2023
27 Dec 2023
Amount
Reclamation of existing dumpsite through Bio- Mining process by Excavating the existing mixed compacted garbage which underwent biological degradation in the land portion e marked by Tambaram City Municipal Corporation (Pallavaram Periya Eri) and loosening the garbage, spraying consortium of Micro organism to sanitise and stabilize the loosened material and heaping them for stabilization Controlling of mal odour by spraying of suitable microbial inoculums, sieving them after stabilization by using mechanical sieving machine or any other equipment at the cost of the Bidder , Adopting eco friendly and non polluting process in order to reduce the impact of dumping site in the adjacent areas. Further segregating the excavated garbage into as many kinds and categories as possible at the cost of Bidder including cost of Bidder’s risk and cost, for sieving, the excavated garbage, storing the segregated materials. Deployment of necessary manpower, materials, equipments, tool and construction of plants and sheds and creation of facilities for handling, separating, segregating and storing for the operation of the plant. Leveling the earth surface by bull-dozer or any other earth moving equipment. Providing security arrangements for the plant project site, machineries, equipments etc at the cost of the Bidder, Completing the work within the contract period as directed by the Departmental officers. The entire segregated materials shall be sold / disposed within fifteen days. The bidder should maintain the ambient quality within the standard prescribed and the activities should not attract any public complaints
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .