Tender Value
₹20.9 L
EMD Value
₹1.5 L
Closing Date
16 May 2020, 3:00 pmClosed
Project Manager
CONSTRUCTION OF ENGINEERING BLOCK (PHASE-II) IN SECOND CAMPUS, LUCKNOW UNIVERSITY, LUCKNOW (BLOCK-B, FIRST AND SECOND FLOOR-FINISHING WORK)
CONSTRUCTION OF ENGINEERING BLOCK (PHASE-II) IN SECOND CAMPUS, LUCKNOW UNIVERSITY, LUCKNOW (BLOCK-C and D, FIRST AND SECOND FLOOR-FLOORING WORK)
2020_UPPRC_467406_3
02/PCL/PM/Unit-8
Open Tender
Machineries
Item Wise
90 days
Lucknow
CONSTRUCTION OF ENGINEERING BLOCK (PHASE-II) IN SECOND CAMPUS, LUCKNOW UNIVERSITY, LUCKNOW (BLOCK-C and D, FIRST AND SECOND FLOOR-FLOORING WORK)
2 documents required · 2 mandatory
₹2,950
Project Manager, Unit-8
₹1.5 L
Lucknow
3 Jun 2020
8 May 2020
16 May 2020
8 May 2020
16 May 2020
8 May 2020
11 May 2020
Amount
Labour charges for laying vitrified floor tiles in different sizes including laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including grouting the joints with white cement and matching pigments but excluding cost of vitrified floor tile as per direction of engineer-in-charge.
Labour Charges for laying Vitrified wall tiles in skirting, riser of steps including over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including grouting the joint with white cement & matching pigments etc but excluding cost of vitrified wall tiles as per direction of engineer-in-charge.
Labour charges for fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture including laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels but excluding cost of 18mm thick gangsaw cut granite as per direction of engineer-in-charge.
Labour charges for laying rectified Glazed Ceramic floor tiles of size 300x300 mm or more, except White, Ivory, Grey, Fume Red Brown including laid on 20 mm thick Cement Mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including pointing the joints with white cement and matching pigments etc but excluding cost of rectified glazed ceremic floor tile as per direction of engineer-in-charge.
Labour charges for fixing Ist quality ceramic glazed wall tiles in skirting, risers of steps and dados including over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade but excluding cost of ceremic glazed wall tiles as per direction of engineer-in-charge.
GST extra as applicable
M/S RAM ASRAY GUPTA CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .