| 1 | L1₹4.5 LAdmitted-Finance | ₹4.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 L+₹23,489 (5.17%)Admitted-Finance | ₹4.8 L+₹23,489 (5.17%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PONRAJ P L1 | M ALAGARSAMY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in Sand silt or other Loose soil wet sand or silt not under water light black cotton soil sandy loam ordinary soil except hard rock requiring blasting including shering and shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 Cm thick well rammed consolidated and depositing the surpless earth within compound in places shown by the departmental officers with all leads and ifts etc, complete | 63 | Cum | 102 ₹6,426 Lowest | 105 ₹6,615 |
| 2.00 | Plain Cement concrete 1:4:8 mix (One cement Four sand and Eight metal) using 40 mm HBG metal for foundation and basement and including cost & conveyance and all labour charges Including dewatering if found necessary and said layer in not more than 15 Cm thick etc., complete as per standard specification. | 12 | Cum | 5,200 ₹62,400 Lowest | 5,480 ₹65,760 |
| 3.00Centering for soffits of RCC slabs of plane surface like lintels, beams, etc including strutting 1.1m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with MS angles of size 25mm X 25mm X 3mm laid over silver Oak (CW) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )arid supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification | |||||
| 3.10 | For Plinth Beam | 150 | Square meter | 450 ₹67,500 Lowest | 465 ₹69,750 |
| 3.20 | For Deck Slab | 25 | Square meter | 600 ₹15,000 Lowest | 630 ₹15,750 |
| 4.00 | Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc.. complete as per standard specification | 25 | Cum | 6,500 ₹1,62,500 Lowest | 6,850 ₹1,71,250 |
| 5.00 | Plastering with cement mortar 1:4 mix (One Cement and Four Sand) 20 mm thick including cost and conveyance of all materials finishing curing and all labour charges etc. complete as per standard specification. | 23 | Cum | 550 ₹12,650 Lowest | 555 ₹12,765 |
| 6.00 | Supplying, fabricating and placing in position of steel Reinforcement using Mild steel or Ribbed Tor Steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc. complete as per standard specification. | 800 | kg | 89 ₹71,200 Lowest | 90 ₹72,000 |
| 7.00 | Reinfoced Cement Concrete 1:1.5:3 (one cement, one and half fine aggregates and three coarse aggregates) Mix using 20mm ISS HBG Metal including cost of Metal and conveyance charges and including all labour charges and all other incidential charges etc., complete as per standard specification. | 7.5 | Cum | 7,500 ₹56,250 Lowest | 8,470 ₹63,525 |
Tender Value
₹5.4 L
EMD Value
₹5,400
Closing Date
19 Aug 2025, 3:00 pmClosed
The Commissioner
O/o The Commissioner,Devakottai Muncipality
Construction of RCC Culvert and SWD to Ward 21 Kuthiraipathai road and Samayapuram mariamman kovil street in Devakottai Municipality
2025_MAWS_575222_2
2025_MAWS_DVK_5
Open Tender
Civil Works - Buildings
Lump-sum
Devakottai Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,400
Yes
20 May 2026
9 Aug 2025
20 Aug 2025
9 Aug 2025
19 Aug 2025
9 Aug 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .