| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance | ₹2.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.9 L+₹3,170.97 (1.10%)Rejected-Finance | ₹2.9 L+₹3,170.97 (1.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.0 L+₹7,206.74 (2.50%)Rejected-Finance NA | NA | NA | 121004 | ₹3.0 L+₹7,206.74 (2.50%) | L3 | Rejected-Finance L3 |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
3 Aug 2026, 2:00 pmClosed
EE(WS)/N
KMC WATER SUPPLY NORTH,79 BIDHAN SARANI,BOROUGH-II
DIVERSION OF 6 INCH FW AND 10 INCH UFW SUPPLY MAIN PIPE AT 52 RD ST TO FACILITATE 1000 MM DIA DRAINGE PIPE LAYING WORK IN WD NO- 28.
2026_KMC_1033820_1
KMC/WS/N/26-27/28/17
Open Tender
CIVIL WORKS
Percentage
7 days
IN WARD NO 28
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
19 Aug 2026
24 Jul 2026
5 Aug 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.27Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For minimum engagement of 8 hrs. In a day | 4 | DAY | 8,951 | ₹35,804 |
| 2 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.27Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For beyond 8hrs. of working | 3 | HR | 1,119 | ₹3,357 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 45 | MTR | 17 | ₹765 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately.(ii) 900 mm. x 600 mm. size of board. | 5 | EA | 813 | ₹4,065 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(b) For additional depth beyond 1.5 m. and upto 3.00 m | 12 | SQM | 439 | ₹5,268 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | 9.6 | SQM | 386 | ₹3,705.6 |
| 7 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto3,000 mm. but not requiring shoring | 1.6 | %M3 | 192.38 | ₹307.81 |
| 8 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] | 432 | HPH | 33 | ₹14,256 |
| 9 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3 M.S. Pipes 2.3.1 Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in- Charge. Thikness in mm 5mm to 8mm thick plate | 20.88 | MTR | 298 | ₹6,222.54 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3.4Field welding of machined ends of pieces of M.S pipes and specials forlaying the same inside trench/over ground by means of electric arc welding as per relevant ISspecification using standard electrodes including edgepreparation and charges of deployment of electric generator set with fuel, lubricant, and all other tools and plants all complete as per specification and direction of Engineer-in-Charge. [ Engineer-in-Charge shall approve the electrodes for arc welding before use ]Throat thickness in mm 10mm | 29.83 | MTR | 2,167 | ₹64,641.61 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Tendernotice_2.pdf
PDF • 1.92 MB
Tendernotice_3.pdf
PDF • 1.73 MB
price2817.pdf
Additional Documents • 0.79 MB
BOQ_2539092.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .