Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAccepted-AOC 304 MAGIZHAMPOO STREET GOMATHIPURAM 6TH MAIN ROAD MADURAI 21 | MADURAI | TAMIL NADU | 625001 | ₹8.2 Cr | L1 | Accepted-AOC L1 contractor |
| 2 | L2₹8.6 Cr+₹41.0 L (5.00%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹8.6 Cr+₹41.0 L (5.00%) | L2 | Rejected-Finance L2 CONTRACTOR |
| 3 | L3₹8.8 Cr+₹57.4 L (7.00%)Rejected-Finance 1 407 1A ENGINEER 4TH CROSS STREET THIRUPPALAI MADURAI 625014 | MADURAI | TAMIL NADU | 625014 | ₹8.8 Cr+₹57.4 L (7.00%) | L3 | Rejected-Finance L3 CONTRACTOR |
| 4 | Rejected-Technical 2 316 B MAGIZHAMPOO STREET GOMATHIPURAM 3RD MAIN ROAD MADURAI 20 | MADURAI | TAMIL NADU | 625020 | - | - | Rejected-Technical Technically not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | Suganya Constructions L2 | SUBASH BUILDERS L3 | M/s. LUCKY ASSOCIATES L1 |
|---|---|---|---|---|---|---|
| 1.00Strengthening and Black Topping Thummakundu - Usilampatti Road to S.Pothampatti - Othapparapatti Road( Via Koolanaickanpatti ) Road km/0/0-1/700 R-297 VPR | ||||||
| 2.00Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | ||||||
| 3.00 | KM 0/0 - 1/700 | 1,836 | m3 | 6.62 ₹12,154.32 | 6.74 ₹12,374.64 | 6.3 ₹11,566.8 Lowest |
| 4.00Picking exiting BT Surface including all materials and labour charges etc complete | ||||||
| 5.00 | KM 0/0 - 1/700 | 2,135.5 | m2 | 24.47 ₹52,255.69 | 24.93 ₹53,238.02 | 23.3 ₹49,757.15 Lowest |
| 6.00Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers | ||||||
| 7.00 | KM 0/0 - 1/700 | 1,326 | m3 | 147.42 ₹1,95,478.92 | 150.23 ₹1,99,204.98 | 140.4 ₹1,86,170.4 Lowest |
| 8.00Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | ||||||
| 9.00 | KM 0/0-1/0 | 281.25 | m3 | 821.1 ₹2,30,934.38 | 836.74 ₹2,35,333.13 | 782 ₹2,19,937.5 Lowest |
| 10.00 | KM 1/0 - 1/700 | 196.88 | m3 | 821.1 ₹1,61,658.17 | 836.74 ₹1,64,737.37 | 782 ₹1,53,960.16 Lowest |
Tender Value
₹8.2 Cr
EMD Value
₹8.4 L
Closing Date
20 Feb 2026, 3:00 pmClosed
Joint Director/Project Director DRDA Madurai
o/o Joint Director/Project Director DRDA Madurai
Madurai District Strengthening of 8 nos of Roads in Chellampatti Sedapatti Usilampatti Blocks under MGSMT (2025-26) Addnl Pakcage no MGSMT (2025-26)Addnl /MDU/01
2026_RDTN_657862_1
DIPR/1021/Tender/2026
Open Tender
Civil Works
Works
180 days
Sedpatti Chellampatti usilampatti
Refer Tender document
3 documents required · 3 mandatory
₹0
₹8.4 L
o/o Joint Director DRDA Madurai
13 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
17 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening and Black Topping Thummakundu - Usilampatti Road to S.Pothampatti - Othapparapatti Road( Via Koolanaickanpatti ) Road km/0/0-1/700 R-297 VPR | - | - | - | - |
| 2 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | - | - | - | - |
| 3 | KM 0/0 - 1/700 | 1,836 | m3 | - | - |
| 4 | Picking exiting BT Surface including all materials and labour charges etc complete | - | - | - | - |
| 5 | KM 0/0 - 1/700 | 2,135.5 | m2 | - | - |
| 6 | Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers | - | - | - | - |
| 7 | KM 0/0 - 1/700 | 1,326 | m3 | - | - |
| 8 | Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | - | - | - | - |
| 9 | KM 0/0-1/0 | 281.25 | m3 | - | - |
| 10 | KM 1/0 - 1/700 | 196.88 | m3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
MGSMT_PKT_01.pdf
Tender Documents • 3.78 MB
BOQ_789145.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .