Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC HISAR | ₹9.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.7 LRejected-Finance | ₹9.7 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical 3491 14 HARIPURA DHAPAI ROAD AMRITSAR | AMRITSAR | PUNJAB | 143001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical NIZAMPUR HARYANA | KURUKSHETRA | HARYANA | 136030 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical PANIPAT URBAN AREA | PANIPAT | PANIPAT | HARYANA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | The Gawar Shree Khatu Shyam Coop. L&C Society Ltd., Gawar L2 | THE BHAVYA VERMA CO-OP LABOUR & CONSTRUCTION SOCIETY LIMITED HISAR L1 |
|---|---|---|---|---|---|
| 1.00 | Demolition and complete removal of existing overhead service reservoir located near Karuna Montessori School including all associated structures, foundations, and appurtenances. The work shall be executed with proper safety measures and precautions as specified herein. Scope of Work The scope includes but is not limited to the following: Preparatory Works: • Site mobilization and establishment of work zone barricading • Conducting structural stability assessment before commencement of demolition Safety Arrangements: • Erection of scaffolding, working platforms, and staging as required for safe demolition operations at various levels • Installation of safety nets, catch platforms, and debris chutes • Provision of personal protective equipment (PPE) for all workers including safety helmets, harnesses, safety shoes, and dust masks • Deployment of trained safety supervisors and implementation of safety protocols • Erection of warning signages, caution boards, and hazard indicators around the work area • Provision of first aid facilities and emergency response arrangements Utility Disconnections: • Safe disconnection and capping of all water supply lines, inlet and outlet pipelines • Disconnection of electrical connections, if any, by authorized electricians • Plugging or sealing of drainage connections • Coordination with utility departments for permanent disconnection Dust Suppression Measures: • Continuous water sprinkling during demolition activities to suppress dust generation • Provision of mist spray systems at demolition points • Covering of debris with tarpaulin sheets during non-working hours • Use of appropriate demolition techniques to minimize dust pollution Demolition Operations: • Systematic dismantling of overhead reservoir structure starting from top to bottom • Removal of roof slab, walls, columns, beams, and foundation in controlled manner • Breaking of RCC/masonry using appropriate tools and machinery • Careful demolition ensuring no damage to adjoining roads, drains, boundary walls, trees, or existing utilities Debris Handling and Disposal: • Collection, segregation, and loading of all demolition debris including concrete, masonry, steel, and other materials • Transportation of debris to approved disposal sites or contractor`s premises • Complete clearing of site leaving it clean and level • Backfilling of foundation excavations with approved material and compaction Site Restoration: • Removal of all scaffolding, platforms, and temporary structures • Cleaning of adjoining areas from spillage or debris • Repair of any inadvertent minor damages to roads or drains • Leveling and dressing of site as directed by Engineer-in-charge Material Ownership All materials obtained from demolition including but not limited to concrete rubble, bricks, stone, sand, steel reinforcement, structural steel, fixtures, and any other salvageable or non-salvageable materials shall become the absolute property of the contractor. The contractor shall remove all such materials from site at his own cost and dispose of. No separate payment shall be made for such materials and the contractor shall quote rates accordingly considering the value of salvaged materials. Quality and Compliance • All work shall be executed strictly as per IS Codes, NBC provisions, and local municipal regulations • Work shall be carried out under constant supervision ensuring quality and safety standards • Contractor shall obtain all necessary permissions, NOCs, and clearances from competent authorities • Work shall be executed to the entire satisfaction of the Engineer-in-charge • Any deficiency or damage caused due to contractor`s negligence shall be rectified at contractor`s cost Note: The contractor shall visit the site, assess all conditions, quantities, and difficulties involved before quoting rates. No claim for extra payment shall be entertained on account of unforeseen conditions or difficulties. | 1 | Job | 9,73,250 ₹9,73,250 | 9,60,500 ₹9,60,500 Lowest |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
30 Jun 2026, 12:00 pmClosed
Gopal Kalawat
Municipal Corporation Panipat
Demolition and Complete Removal of Existing Overhead Service Reservoir (OHT) near Karuna Montessori School, Ward No. 20, under Municipal Corporation Panipat. For L and C Society.
2026_HRY_530610_1
20264FE14BA0 2461 4BBB 83BB C110D408569A286ULB
Open Tender
Civil Works
Works
160 days
Panipat
2 documents required · 2 mandatory
₹1,000
₹17,000
Yes
11 Aug 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition and complete removal of existing overhead service reservoir located near Karuna Montessori School including all associated structures, foundations, and appurtenances. The work shall be executed with proper safety measures and precautions as specified herein. Scope of Work The scope includes but is not limited to the following: Preparatory Works: • Site mobilization and establishment of work zone barricading • Conducting structural stability assessment before commencement of demolition Safety Arrangements: • Erection of scaffolding, working platforms, and staging as required for safe demolition operations at various levels • Installation of safety nets, catch platforms, and debris chutes • Provision of personal protective equipment (PPE) for all workers including safety helmets, harnesses, safety shoes, and dust masks • Deployment of trained safety supervisors and implementation of safety protocols • Erection of warning signages, caution boards, and hazard indicators around the work area • Provision of first aid facilities and emergency response arrangements Utility Disconnections: • Safe disconnection and capping of all water supply lines, inlet and outlet pipelines • Disconnection of electrical connections, if any, by authorized electricians • Plugging or sealing of drainage connections • Coordination with utility departments for permanent disconnection Dust Suppression Measures: • Continuous water sprinkling during demolition activities to suppress dust generation • Provision of mist spray systems at demolition points • Covering of debris with tarpaulin sheets during non-working hours • Use of appropriate demolition techniques to minimize dust pollution Demolition Operations: • Systematic dismantling of overhead reservoir structure starting from top to bottom • Removal of roof slab, walls, columns, beams, and foundation in controlled manner • Breaking of RCC/masonry using appropriate tools and machinery • Careful demolition ensuring no damage to adjoining roads, drains, boundary walls, trees, or existing utilities Debris Handling and Disposal: • Collection, segregation, and loading of all demolition debris including concrete, masonry, steel, and other materials • Transportation of debris to approved disposal sites or contractor`s premises • Complete clearing of site leaving it clean and level • Backfilling of foundation excavations with approved material and compaction Site Restoration: • Removal of all scaffolding, platforms, and temporary structures • Cleaning of adjoining areas from spillage or debris • Repair of any inadvertent minor damages to roads or drains • Leveling and dressing of site as directed by Engineer-in-charge Material Ownership All materials obtained from demolition including but not limited to concrete rubble, bricks, stone, sand, steel reinforcement, structural steel, fixtures, and any other salvageable or non-salvageable materials shall become the absolute property of the contractor. The contractor shall remove all such materials from site at his own cost and dispose of. No separate payment shall be made for such materials and the contractor shall quote rates accordingly considering the value of salvaged materials. Quality and Compliance • All work shall be executed strictly as per IS Codes, NBC provisions, and local municipal regulations • Work shall be carried out under constant supervision ensuring quality and safety standards • Contractor shall obtain all necessary permissions, NOCs, and clearances from competent authorities • Work shall be executed to the entire satisfaction of the Engineer-in-charge • Any deficiency or damage caused due to contractor`s negligence shall be rectified at contractor`s cost Note: The contractor shall visit the site, assess all conditions, quantities, and difficulties involved before quoting rates. No claim for extra payment shall be entertained on account of unforeseen conditions or difficulties. | 1 | Job | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_609659.xls
BOQ • 0.25 MB
530610.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].